• 热门标签
时间:2010-06-06 22:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

paragraph to conduct operations as a Single Pilot Operator. The certificate holder shall conduct all
operations under CCAR- 135 and these conditions and limitations.
b. The only individual used as a pilot is:
NAME CERTIFICATE NUMBER
c. No Category II or III instrument approach operations are conducted.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) A0069-1 Certificate No:
Effective Date: Y M D
A0069 AUTOPILOT IN LIEU OF REQUIRED CO-PILOT
The certificate holder is authorized to use the aircraft and its autopilot system listed below, in IFR
operations, in lieu of a required Co-pilot provided the following provisions are met.
a. The Pilot-in-command has satisfactorily completed the proficiency check required by CCAR -
135 Section 135.103 (b).
b. The installed autopilot system is operational in accordance with CCAR-135 Section
135.103(b)(1).
AIRCRAFT
(M/M/S)
AUTOPILOT SYSTEM
(MANUFACTURER/MODEL)
ADDITIONAL
CONDITIONS / LIMITATIONS
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) A0071-1 Certificate No:
Effective Date: Y M D
A0071 AUTHORIZATION CCAR -135 AIRPLANE OPERATORS CONDUCTING PRE-TAKEOFF CONTAMINATION
CHECK
a. The certificate holder is authorized to conduct a pre-takeoff contamination check or use an
approved alternate procedure as described below.
(1) At any time the conditions are such that frost, ice, or snow may reasonably be expected to
adhere to the aircraft, the certificate holder will check the aircraft prior to takeoff or use an approved
alternate procedure. The check/procedure shall ensure that the wings, control surfaces, propellers,
engine inlets, and other critical surfaces are free of frost, ice, or snow.
(2) Procedures for the conduct of this check or its alternate are described or referenced in this
paragraph.
(3) In addition to the above, the pilots shall demonstrate knowledge to operate in ground icing
conditions during the initial and recurrent flight checks.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) A0073-1 Certificate No:
Effective Date: Y M D
A0073 AUTHORIZATION FOR CCAR PART 135 AIRPLANE OPERATORS WITHOUT A DEICING/ANTI-ICING
PROCEDURE
a. This paragraph only apply when certificate holder does not operate in ground icing
conditions. Under the regulation, ground icing conditions exist whenever there are such that frost,
ice, or snow may reasonably be expected to adhere to the aircraft. The certificate holder who does
not operate in ground icing conditions is not required to train its pilots or develop pre-takeoff
contamination procedures.
b. If ground icing conditions do not exist at anytime during the certificate holder’s operation, the
certificate holder is authorized to operate without a ground deice/anti-icing procedure.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CCAR121_135 Operations Specifications(21)