Airships
SECTION 1 — PRE-FLIGHT OPERATIONS AND DEPARTURE Use of checklist, airmanship, ATC liaison compliance, R/T procedures, apply in all sections
a Use of flight manual (or equivalent) especially a/c performance calculation, mass and balance
b Use of Air Traffic Services document, weather document
c Preparation of ATC flight plan, IFR flight plan/log
d Pre-flight inspection
e Weather minima
f Pre-take-off briefing, off mast procedure, manoeuvring on ground
EN EN
g Take-off
h Transition to instrument flight
i Instrument departure procedures, altimeter setting
j ATC liaison - compliance, R/T procedures
SECTION 2 — GENERAL HANDLING
a Control of the airship by reference solely to instruments
b Climbing and descending turns with sustained rate of turn
c Recoveries from unusual attitudes
d Limited panel
SECTION 3 — EN-ROUTE IFR PROCEDURES
a Tracking, including interception, e.g. NDB, VOR, RNAV
b Use of radio aids
c Level flight, control of heading, altitude and airspeed, power setting, trim technique
d Altimeter settings
e Timing and revision of ETAs
f Monitoring of flight progress, flight log, fuel usage, systems’ management
g ATC liaison – compliance, R/T procedures
SECTION 4 — PRECISION APPROACH PROCEDURES
a Setting and checking of navigational aids, identification of facilities
EN EN
b Arrival procedures, altimeter checks
c Approach and landing briefing, including descent/approach/landing checks
d+ Holding procedure
e Compliance with published approach procedure
f Approach timing
g Stabilised approach (altitude, speed and heading control)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:欧洲委员会规章 EUROPEAN COMMISSION Regulations(112)