 A. ABS0717
R R  (1) P/N identification ABS0717 - 01 | 02 | | | ------------------ Type code --------------------------- Standard P/N
 (2) P/N characteristics
 (a) Temperature Minimum operating temperature is : -65 deg.C (-85.00 deg.F). Maximum operating temperature is : 200 deg.C (392.00 deg.F).
 (b) Cavity arrangement code (Ref. Fig. 001)
 (3) Installation procedure
R R R R  (a) Preparation - Make sure the installation area is clean. - Attach the pressure seal to the structure, paying attention to the direction of installation of the grommet. - Ensure that the O-ring is installed and make certain that this is positioned correctly in the groove. - Tighten the nut of the grommet between 0.36 m.daN (31.8584 lbf.in) and 0.42 m.daN (37.1681 lbf.in). - Secure with a lockwire.

 


R Pressure Seal - Grommet Type - Cavity Arrangements ABS0717 Figure 001


20-43-41 Page 2

 -Slide the accessories (threaded ring, backshell with strain-relief etc.) onto the cable harness.
 -Cut the wires at right-angles.
 ____
NOTE : The wire cut must be clean without any protruding part or burns to avoid damage to the grommet of the pressure seal.
 (b) Insertion of the electrical wires
 -The tools and electrical wires must be clean and should be aligned with the axis of the hole during insertion to avoid damage to the grommet.
 ____
NOTE : Do not use lubricants for installation of the wires in the grommets.
 -Insert the wires in the holes of the grommet. R - Slowly draw the wires through the pressure seal until they R reach their final position.
 -The holes not used must be sealed with blind cables or sealing plugs.
 -Install the accessories (threaded ring, backshell with strain-relief etc.) on the pressure seal.


20-43-41 Page 3
 B. ABS0834


 (1) P/N identification
 ABS0834 - 24 - N 01 
R  | | | | 
R  | | | ------------ Part type code 
R  | | -------------- Finish code N = Nickel 
R  | ------------------ Shell size code 
R  --------------------------- Standard P/N
 (2) P/N characteristics
 (a) Temperature
 Minimum operating temperature is : -55 deg.C (-67.00 deg.F).
 Maximum operating temperature is : 200 deg.C (392.00 deg.F).
 (b) Cavity arrangement code
 (Ref. Fig. 002)
 (3) Installation procedure 

R  (a) Preparation 
R  - Degrease and clean the surfaces using a lint face cloth and a 
R  small amount of cleaning agent (Material N.11-003). 
R  - Attach the pressure seal to the structure, paying attention to 
R  the direction of installation of the grommet. 
R  - Ensure that the O-ring is installed and make certain that this 
R  is positioned correctly in the groove. 
R  - Tighten the nut of the grommet between 1.23 m.daN (108.8495 
R  lbf.in) and 1.37 m.daN (10.1032 lbf.ft). 
R  - Slide the accessories (threaded ring, backshell with 
R  strain-relief etc.) onto the cable harness. 
R  (b) Insertion of the electrical wires 
R  - Cut the wires at right-angles.
R  ____NOTE : The wire cut must be clean without any protruding part or 
R  burns to avoid damage to the grommet of the pressure seal. 
R  - Wrap tape around the end of the cable. 
R  - The tools and electrical wires must be clean and should be 
R  aligned with the axis of the hole during insertion to avoid 
R  damage to the grommet.
R  ____NOTE : Do not use lubricants for installation of the wires in the 
R  grommets.

 

20-43-41 Page 4

R Pressure Seal - Grommet Type - Cavity Arrangement ABS0834 Figure 002


20-43-41 Page 520-43-41 Page 620-43-41 Page 7

 - Insert the wire.
 - Slowly draw the wire through the pressure seal until it reaches
 its final position.
 - Secure the cable with the cable tie so that the cable will not
 move in the pressure seal.
 - Inject compound (Material N. 09-002) around the base of the
 wires.
 - Clean off surplus sealant with solvent (Material N.11-003). 

R  (4) Wire addition procedure
 - Clean and degrease the by-pass tube with solvent (Material
 N.11-003).
 - Wrap tape around the end of the wire.
 - Insert the wire to be added in the by-pass tube.
 - Slowly draw the wire through the by-pass tube until it reaches its
 