• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 NOTE : The Installation Reference Markers are fiberglass tape on the
____
 harnesses.

 (6) On the left side of the engine, put the harness into the clamp (40) and install the bolt (15).

 (7) On the left side of the engine, put the clamps (40) on the harness. Attach the clamps (40) to the brackets near station 221 with the bolt (15).


 F 『 EEFF : ALL E Page 49271-52-43
 E E Aug 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (8) On the left side of the engine, put the clamp (35) on the harness.
 Attach the clamp (35) to the bracket at station 221 with the bolt
 (15).


 (9) On the left side of the engine, put the clamp (70) on the harness.
 Attach the clamp (70) to the brackets at station 215 with the bolt
 (15). Make sure the reference marker is correctly aligned.

 

 (10) Connect the electrical connector 4000HA-A to the High-Pressure Regulator Valve (4000HA).

 (11) On the right side of the engine, put the clamp (45) on the harness. Attach the clamp (45) to the bracket at station 221 with the bolt (15).

 (12) On the right side of the engine, put the clamp (40) on the harness. Attach the clamp (40) to the bracket at station 221 with the bolt (15). Make sure the reference marker is correctly aligned.

 (13) On the right side of the engine, put the clamp (50) on the harness. Attach the clamp (50) to the bracket at station 221 with the bolt (15).

 (14) Connect the electrical connector 4001HA-A to the Bleed-Pressure Regulator Valve (4001HA).

 (15) Put the three GD9972 ground wires on the ground stud GD9972. Attach the wires with the washers (60) and (65) and the nut (55).

 (16) Put the two GD9973 ground wires on the ground stud GD9973. Attach the wires with the washers (60) and (65) and the nut (55).

 (17) Make sure that the harness 4207KS is correctly installed on the engine.

 (18) TORQUE the bolts (15) to between 20 and 25 lbf.in (0.22 and 0.28 m.daN).


 F 『R EEFF : 001-049, 051-099, 101-149, 151-155, E Page 49371-52-43
 E E157-199, 201-299, 301-399, 401-499, Aug 01/05 E E ECES E **ON A/C 156-156,

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 Subtask 71-52-43-420-058-A
 A. Installation of the Environmental Control System (ECS) Harness Assembly (4207KS) (Ref. Fig. 404A/TASK 71-52-43-991-308-A)
 NOTE : When using fiberglass clamps on the engine core harnesses, do as
____ follows: Wrap fiberglass adhesive tape (Material No. CP2208) around the harness(es) to make sure that the clamps do not move when they are installed. Wrap only the locations where the clamps are being installed.
 NOTE : Before you tighten the clamps, adjust the wire harness to get the
____ maximum clearance between the harness and the other structures on the engine. Make sure that the harness will not touch other structures.
 (1) Remove the blanking caps from the electrical connectors.

 (2) Put the harness 4207KS in position on the engine.

 (3) Connect the electrical connector 450VC-A to the core junction box.

 (4) Put the two clamps (10) on the harness 4207KS. Attach the clamps to the pylon with the bolts (5).

 (5) Put the harness 4207KS into the thermal blanket (30) and (25), as required.

 (6) Use a new piece of lacing and tying tape (Material No. CP8003) at each eyelet set. Tie the lacing and tying tape (Material No. CP8003) in a square knot.


 NOTE : Do not tighten the lacing and tying tape (Material No. CP8003)
____ too much. There must be a clearance between the thermal blanket flaps.
 (7) Put the harness into the clamp (20) attached to the bracket at station 233. Make sure the reference marker is correctly aligned. Install the bolt (15).
 NOTE : The Installation Reference Markers are fiberglass tape on the
____
 harnesses.

 F 『R EEFF : 156-156, E Page 49471-52-43
 E E May 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (8) On the left side of the engine, put the harness on the clamp (40) and install the bolt (15).

 (9) On the left side of the engine, put the clamps (40) on the harness. Attach the clamps (40) to the brackets near station 221 with the bolt (15).


 (10) On the left side of the engine, put the clamp (35) on the harness. Attach the clamp (35) to the bracket at station 221 with the bolt (15). Make sure the reference marker is correctly aligned.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2(97)