• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 F 『 EEFF : ALL E Page 48971-52-43
 E E May 01/05 ERE
ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM/CVR/CTL 4RK E13 49VU NAV PROBES/ADIRU 1/AND AOA 1/26VAC 5FP1 F07 49VU NAV PROBES/ADIRU1/115VAC 4FP1 F06
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 49VU ANTI ICE/RAIN/RPLNT/CAPT  1DB1 D01
 **ON A/C ALL
 105VU ADIRS/ADIRU1/28VDC  6FP1 C02
 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU ADIRS/ADIRU/2/26VAC AND AOA 5FP2 N09 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N08 121VU ADIRS/ADIRU/2/115VAC 4FP2 N07 121VU ADIRS/ADIRU/3/115VAC 4FP3 N06 121VU ADIRS/ADIRU/2/28VDC 6FP2 N05 121VU ADIRS/ADIRU/3/28VDC 6FP3 N04
 **ON A/C ALL
 121VU RCDR/DFDR 7TU K16 121VU ENGINE/ENG2/OIL/PRESS 2EN2 N42 121VU ENGINE/ENG2/OIL/QTY 1EN2 N41 121VU ENGINE/ENG1/OIL/PRESS 2EN1 N40 121VU ENGINE/ENG1/OIL/QTY 1EN1 N39 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41 121VU ENGINE/ENG2/FADEC B 4KS2 Q40 121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39 121VU ENGINE/ENG1/FIRE DET/LOOP B 8WD1 Q38
 F 『 EEFF : ALL E Page 49071-52-43
 E E Aug 01/05 E E ECES E -------------------------------------------------------------------------------

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


PANEL DESIGNATION  IDENT. LOCATION
 -------------------------------------------------------------------------------
121VU ENGINE/ENG1/FADEC B/AND EIU 1  4KS1 R41
R  **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU ADIRS/ADIRU/2/26VAC AND AOA 5FP2 N08 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N07 121VU ADIRS/ADIRU/2/115VAC 4FP2 N06 121VU ADIRS/ADIRU/3/115VAC 4FP3 N05 121VU ADIRS/ADIRU/2/28VDC 6FP2 N04 121VU ADIRS/ADIRU/3/28VDC 6FP3 N03
 **ON A/C ALL
 122VU ELEC/GCU/2 2XU2 T27 122VU ELEC/GCU/1 2XU1 T26 122VU ANTI ICE/WINDOWS/R 4DG2 W14 122VU ANTI ICE/WINDOWS/L 4DG1 X14 122VU ANTI ICE/PROBES/PHC/3 2DA3 Y16 122VU ANTI ICE/PROBES/2/TAT 1DA2 Y15 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14 122VU ANTI ICE/PROBES/2/AOA 4DA2 Y13 122VU ANTI ICE/PROBES/2/PHC 2DA2 Y12 122VU ANTI ICE/PROBES/2/STATIC 5DA2 Y11 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14 122VU ANTI ICE/PROBES/1/STATIC 5DA1 Z13 122VU ANTI ICE/PROBES/1/TAT 1DA1 Z12
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 122VU ANTI ICE/RAIN/RPLNT/F/O  1DB2 W11
 F 『 EEFF : ALL E Page 49171-52-43
 E E Aug 01/05 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 **ON A/C ALL
 4. Procedure
_________
R **ON A/C 001-049, 051-099, 101-149, 151-155, 157-199, 201-299, 301-399, R 401-499,
 Subtask 71-52-43-420-058
 A. Installation of the Environmental Control System (ECS) Harness Assembly (4207KS) (Ref. Fig. 404/TASK 71-52-43-991-308)
 NOTE : When using fiberglass clamps on the engine core harnesses, do as
____ follows: Wrap fiberglass adhesive tape (Material No. CP2208) around the harness(es) to make sure that the clamps do not move when they are installed. Wrap only the locations where the clamps are being installed.
 NOTE : Before you tighten the clamps, adjust the wire harness to get the
____ maximum clearance between the harness and the other structures on the engine. Make sure that the harness will not touch other structures.
 (1) Remove the blanking caps from the electrical connectors.

 (2) Put the harness 4207KS in position on the engine.

 (3) Connect the electrical connector 450VC-A to the core junction box.

 (4) Put the two clamps (10) on the harness 4207KS. Attach the clamps to the pylon with the bolts (5).

 (5) Put the harness into the clamp (20) attached to the bracket at station 233. Make sure the reference marker is correctly aligned. Install the bolt (15).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2(96)