• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 F 『 EEFF : ALL E Page 47371-51-43
 E E Aug 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39 122VU ELEC/GCU/2 2XU2 T27
 4. Procedure
_________
 (Ref. Fig. 406/TASK 71-51-43-991-311, 407/TASK 71-51-43-991-312) Subtask 71-51-43-420-056
 A. Installation of the ECU (Channel A) Harness NOTE : For the recommended procedure for the installation of the wire
____
 harness (Ref. TASK 70-60-00-910-041).

 NOTE : To tighten the flip-lock clamps and line blocks, turn the captive
____ screws or captive bolts 1/4 turn clockwise to engage the cam nuts.
 (1) Remove the protective covers from the electrical connectors.

 (2) Put the electrical harness (5) in position on the engine.

 (3) Connect the electrical connectors 402VC-A and 406VC-A to the pylon junction box. (Ref. Fig. 406/TASK 71-51-43-991-311)

 (4) Connect the electrical connector 4004VC-A to the junction box at station 176.

 (5) Put the harness (5) into the flip-lock clamp (10).

 (6) Put the harness (5) into the rubber supports of the line blocks. BEFORE SPIB NO. CFM02255MW1

 (7) Put the rubber supports in the line blocks (15), (20), (25) attached to the brackets at station 158.

 CONFIG-1

 (8) Put the rubber support into the line block (30) attached to the bracket at station 167.


 CONFIG-2
 F 『 EEFF : ALL E Page 47471-51-43
 E E May 01/05 ERE
ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (Ref. Fig. 406/TASK 71-51-43-991-311)
 (Detail B)


 (9) Put the clamp (60) on the harness (5). Use the bolt (55) to attach the clamp (60) to the bracket at station 167.
 (10) TORQUE the bolt (55) to between 25 and 30 lbf.in (0.28 and 0.33 m.daN).

 END CONFIG-2

 (11) Put the harness (5) into the rubber supports of the line blocks (25), (40), (45) and (50). (Ref. Fig. 407/TASK 71-51-43-991-312)

 (12) Put the rubber supports in the line blocks (25), (40), (45) and (50).

 (13) Make sure that the harness (5) is correctly installed on the engine.

 (14) Close the line blocks and tighten the captive bolts.

 (15) Put the harness (5) into the flip-lock clamp (35) and tighten the


 captive screw. R R AFTER SPIB NO. CFM02255MW1 R (Ref. Fig. 406/TASK 71-51-43-991-311) R
R (16) Put the rubber supports in the line blocks (25) attached to the R brackets at station 158.
R (17) Put the bolt and clamps (17) that attach the harness (5) to the R bracket at station 158.
R (18) Put the bolts and clamps (22) that attach the harness (5) to the R bracket at station 158. R R CONFIG-1 R
R (19) Put the rubber support into the line block (30) attached to the R bracket at station 167. R R CONFIG-2 R (Ref. Fig. 406/TASK 71-51-43-991-311) R (Detail B) R
 F 『 EEFF : ALL E Page 47571-51-43
 E E Feb 01/04 E E ECES E F 『 EEFF : ALL E Page 47671-51-43

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E 


R  (20) Put the clamp (60) on the harness (5). Use the bolt (55) to attach 
R  the clamp to the bracket at station 167. 
R  (21) TORQUE the bolt (55) to between 25 and 30 lbf.in (0.28 and 0.33
 m.daN). 

R  END CONFIG-2 

R  (22) Put the harness (5) into the rubber supports of the line blocks (25), 
R  (40), (45) and (50). 
R  (Ref. Fig. 407/TASK 71-51-43-991-312) 
R  (23) Put the rubber supports in the line blocks (25), (40), (45) and (50). 
R  (24) Make sure that the harness (5) is correctly installed on the engine. 
R  (25) Close the line blocks and tighten the captive bolts. 
R  (26) Put the bolt, clamp and anti-rotation lug (37) on the harness (5) and 
R  install on the engine bracket near the ignition exciter A. 
R  (27) TORQUE the bolts (17), (22) and (37) to between 25 and 30 lbf.in
 (0.28 and 0.33 m.daN). 

R  END SPIB NO. CFM02255MW1 

R  (28) Connect the electrical connector 4000JH1-A to the ignition exciter A. 
R  (29) Connect the electrical connectors 4000KS-J1 and 4000KS-J5 to the ECU.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2(34)