• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 49VU ANTI ICE/RAIN/RPLNT/CAPT  1DB1 D01
 **ON A/C ALL
 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU ANTI ICE/WINDOWS/R 4DG2 W14 122VU ANTI ICE/WINDOWS/L 4DG1 X14 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14 122VU ANTI ICE/PROBES/2/AOA 4DA2 Y13 122VU ANTI ICE/PROBES/2/STATIC 5DA2 Y11 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14 122VU ANTI ICE/PROBES/1/STATIC 5DA1 Z13
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 122VU ANTI ICE/RAIN/RPLNT/F/O  1DB2 W11
 **ON A/C ALL
 123VU Y HYD/ELEC/PUMP  3802GX AB06
 123VU Y HYD/ELEC/ELEC PUMP/NORM  3801GX AB03
 FOR 1000EM1 49VU ENGINE/1/FIRE DET/LOOP A 7WD1 A06 49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
 121VU ENGINE/IGN/ENG1/SYS B  3JH1 P41
 F 『 EEFF : ALL E Page B40971-51-43
 E E Aug 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43 121VU ENGINE/ENG1/FIRE DET/LOOP B 8WD1 Q38 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41 122VU ELEC/GCU/1 2XU1 T26
 FOR 1000EM2 49VU ENGINE/2/FIRE DET/LOOP B 8WD2 A07 49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41 121VU ENGINE/ENG2/FADEC B 4KS2 Q40 121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39 122VU ELEC/GCU/2 2XU2 T27
 4. Procedure
_________
 **ON A/C 001-049, 051-061, 101-102, 201-202,
 (Ref. Fig. 417/TASK 71-51-43-991-320)
R **ON A/C 062-099, 103-149, 151-199, 203-299, 301-399, 401-499,
 (Ref. Fig. 417A/TASK 71-51-43-991-320-A)
 **ON A/C 001-049, 051-061, 101-102, 201-202,
 Subtask 71-51-43-420-062
 A. Installation of the Fire Detector (Channel B) Harness
 NOTE : For the recommended procedure for the installation of the wire
____
 harness (Ref. TASK 70-60-00-910-041).

 NOTE : To tighten the flip-lock clamps and line blocks, turn the captive
____ screws or captive bolts 1/4 turn clockwise to engage the cam nuts.
 (1) Remove the protective covers from the electrical connectors.
 F 『 EEFF : ALL E Page B41071-51-43
 E E Aug 01/05 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (2) Put the electrical harness (5) in position on the engine.

 (3) Connect the electrical connector 409VC-A to the pylon junction box. (Ref. Fig. 417/TASK 71-51-43-991-320)

 (4) Put the harness (5) into the rubber supports of the line blocks (10) and the flip-lock clamp (15) on the top RH side of the engine.

 (5) Make sure that the harness (5) is correctly installed on the engine.

 (6) Tighten the flip-lock clamp (15) captive screw.

 (7) Put the rubber supports in the line blocks (10). Close the line blocks and tighten the captive bolts.

 BEFORE SPIB NO. CFM02255MW1

 (8) Put the harness (5) into the rubber supports of the line blocks (10),

 (20) and (25) near the top LH side of the engine. (Ref. Fig. 417/TASK 71-51-43-991-320)

 (9) Put the rubber supports in the line blocks (10) at station 174, line block (20) at station 176 and line block (25) at station 185.


 (10) Make sure that the harness (5) is correctly installed on the engine.

 (11) Close the line blocks (10), (20) and (25) and tighten the captive bolts.

 (12) Put the harness (5) into the flip-lock clamps (30) and the rubber support of the line block (35) at station 191.

 (13) If removed, put the rubber support in the line block (35).

 (14) Close the line block (35) and tighten the captive bolt.

 (15) Tighten the captive screws on the flip-lock clamps (30).

 (16) Put the harness (5) into the rubber supports of the two line blocks

 (35) at station 191 and station 199.
 (Ref. Fig. 417/TASK 71-51-43-991-320)


 (17) Put the harness (5) into the rubber supports of the two line blocks
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2(69)