F  『 
 E  C F M  E 
 E  E 
 E  56-5B  E 
 E  E
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
**ON A/C ALL 
 123VU Y HYD/ELEC/PUMP  3802GX  AB06 
 123VU Y HYD/ELEC/ELEC PUMP/NORM  3801GX  AB03 
 FOR 1000EM1 
 49VU ENGINE/1/FIRE DET/LOOP A  7WD1  A06 
 49VU ENGINE/1/FADEC A/AND EIU 1  2KS1  A04 
 121VU ENGINE/IGN/ENG1/SYS B  3JH1  P41 
 121VU ENGINE/IGN/ENG1/SYS A BAT  2JH1  P39
 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 121VU ENGINE/ENG1/FIRE DET/LOOP B 121VU ENGINE/ENG1/FADEC B/AND EIU 1 122VU ELEC/GCU/1 FOR 1000EM2 49VU ENGINE/2/FIRE DET/LOOP B 49VU ENGINE/2/FADEC A/AND EIU 2 121VU ENGINE/IGN/ENG2/SYS B 121VU ENGINE/IGN/ENG2/SYS A BAT 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 121VU ENGINE/ENG2/FADEC B 121VU ENGINE/ENG2/FIRE DET/LOOP A 122VU ELEC/GCU/2  2WE1 1WE1 8WD1 4KS1 2XU1 8WD2 2KS2 3JH2 2JH2 2WE2 1WE2 4KS2 7WD2 2XU2  Q44Q43Q38R41T26A07A05P42P40Q42Q41Q40Q39T27 
 Subtask 71-51-43-010-066 
 C. Get Access 
 (1) Open the fan cowls: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR 
 (2) Put the access platform in position.
 F 『 EEFF : ALL E Page A42771-51-43
 E E Feb 01/04 ERE 
ECES E
 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 4. Procedure
_________
 (Ref. Fig. 412/TASK 71-51-43-991-316)
 Subtask 71-51-43-020-063
 A. Removal of the ECU (Channel B) to Thrust Reverser Junction Box Harness (4214KS).
 NOTE : To open the flip-lock clamps and line blocks, turn the captive
____ screws or bolts 1/4 turn counterclockwise to disengage the cam nuts. 
R NOTE : Loosely attach the clamp(s), anti-rotation lug(s) if applicable,
____ R and bolt(s) to the brackets from which they were removed to make R it easier for installation.
 (1) Disconnect the electrical connector 4006VC-A from the harness junction box.
CONFIG-1
(2) Open the line block (10) that attaches the harness (5) to the bracket at station 167. If necessary remove the rubber support from the line block (10).
CONFIG-2
(3) Remove the bolt (20) that attaches the clamps (15) and (25) to the bracket at station 167. Remove the clamp (25) from the harness (5).
(4) Leave the clamp (15) on the harness 4215KS and loosely install the bolt (20).
END CONFIG-2
(5) Open the line blocks (30) and (35) that attach the harness (5) to the brackets.
(6) If necessary, remove the rubber supports from the line blocks (10),
 (30) and (35).
 (7) Remove the harness (5) from the rubber supports. R R BEFORE SPIB NO. CFM02255MW1 R
 F 『 EEFF : ALL E Page A42871-51-43
 E E Feb 01/04 E E ECES E
 F  『 
 E  C F M  E 
 E  E 
 E  56-5B  E 
 E  E
 INTENTIONALLY BLANK
 F 『R E E Page A42971-51-43
 E E Feb 01/04 E E ECES E F 『 E C F M E E E E 56-5B E
R ECU Channel B to Thrust Reverser Junction Box Harness R Figure 412/TASK 71-51-43-991-316- 12 (SHEET 1)
 F 『 EEFF : ALL E Page A43071-51-43
 E E Feb 01/04 E E ECES E F 『 E C F M E E E E 56-5B E
R ECU Channel B to Thrust Reverser Junction Box Harness R Figure 412/TASK 71-51-43-991-316- 22 (SHEET 2)
 F 『 EEFF : ALL E Page A43171-51-43
 E E Feb 01/04 E E ECES E F 『 EEFF : ALL E Page A43271-51-43
 F  『 
 E  C F M  E 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2(49)