R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 122VU ANTI ICE/RAIN/RPLNT/F/O  1DB2 W11
 **ON A/C ALL
 123VU Y HYD/ELEC/PUMP  3802GX AB06
 123VU Y HYD/ELEC/ELEC PUMP/NORM  3801GX AB03
 FOR 1000EM1 49VU ENGINE/1/FIRE DET/LOOP A 7WD1 A06 49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43 121VU ENGINE/ENG1/FIRE DET/LOOP B 8WD1 Q38 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41 122VU ELEC/GCU/1 2XU1 T26
 FOR 1000EM2 49VU ENGINE/2/FIRE DET/LOOP B 8WD2 A07 49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41 121VU ENGINE/ENG2/FADEC B 4KS2 Q40 121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39
 F 『 EEFF : ALL E Page A48271-51-43
 E E Aug 01/05 E E ECES E -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


122VU ELEC/GCU/2 2XU2 T27
 4. Procedure
_________
 (Ref. Fig. 416/TASK 71-51-43-991-310)
 Subtask 71-51-43-420-061

 A. Installation of the Fire Detector (Channel A) Harness NOTE : For the recommended procedure for the installation of the wire
____
 harness (Ref. TASK 70-60-00-910-041).

 NOTE : To tighten the flip-lock clamps and line blocks, turn the captive
____ screws or captive bolts 1/4 turn clockwise to engage the cam nuts.
 (1) Remove the protective covers from the electrical connectors.

 (2) Put the electrical harness (5) in position on the engine.

 (3) Connect the electrical connector 408VC-A to the pylon junction box. (Ref. Fig. 416/TASK 71-51-43-991-310)

 (4) Put the harness (5) into the rubber supports of the line blocks (10).

 (5) If removed, put the rubber supports in the line blocks (10).

 (6) Make sure that the harness (5) is correctly installed on the engine.


 (7) Close the line blocks (10) and tighten the captive bolts. R R BEFORE SPIB NO. CFM02255MW1 R
 (8) Put the harness (5) into the rubber supports of the line blocks (10) and (15) near the top left side of the engine. (Ref. Fig. 416/TASK 71-51-43-991-310)

 (9) If removed, put the rubber supports in the line blocks (10) at station 174 and line block (15) at station 167.


 (10) Make sure that the harness (5) is correctly installed on the engine.

 (11) Close the line blocks (10) and (15) and tighten the captive bolts.


 F 『 EEFF : ALL E Page A48371-51-43
 E E Feb 01/04 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (12) Put the harness (5) into the rubber supports of the line blocks (20) and (25) at station 158.

 (13) If removed, put the rubber supports in the line blocks (20) and (25).

 (14) Close the line blocks (20) and (25) and tighten the captive bolts.

 (15) Put the harness (5) into the rubber supports of the line blocks (15) and (25) at station 158. (Ref. Fig. 416/TASK 71-51-43-991-310)

 (16) If removed, put the rubber supports in the line blocks (15) and (25).

 (17) Make sure that the harness (5) is correctly installed on the engine.

 (18) Close the line blocks (15) and (25) and tighten the captive bolts.

 (19) Put the harness (5) in the flip-lock clamp (30) at station 167 and


 tighten the captive screw. R R AFTER SPIB NO. CFM02255MW1 R (Ref. Fig. 416/TASK 71-51-43-991-310) R
R (20) Put the harness (5) into the rubber supports of the line blocks (10)
R near the top left side of the engine.
R (Ref. Fig. 416/TASK 71-51-43-991-310)

R (21) If removed, put the rubber supports in the line blocks (10).

R (22) Make sure that the harness (5) is correctly installed on the engine.

R (23) Close the line block (10) and tighten the captive bolts.

R (24) Install the bolt, clamps and anti-rotation lug (17) at station 167.

R (25) Install the bolts, clamps and anti-rotation lugs (22) attached to the
R brackets at station 158.

R (26) Put the harness (5) into the rubber supports of the line blocks (15)
R and (25) at station 158.
R (Ref. Fig. 416/TASK 71-51-43-991-310)
 