 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03 49VU ANTI ICE/PROBES/AOA/1 4DA1 D04 49VU ANTI ICE/PROBES/PITOT/1 3DA1 D02 49VU COM/CVR/SPLY 2RK E14 49VU COM/CVR/CTL 4RK E13
R **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149, R 151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 49VU ANTI ICE/RAIN/RPLNT/CAPT 1DB1 D01
 **ON A/C ALL
 121VU RCDR/DFDR 7TU K16
 F 『 EEFF : ALL E Page A48871-51-43
 E E Aug 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU ANTI ICE/WINDOWS/R 4DG2 W14 122VU ANTI ICE/WINDOWS/L 4DG1 X14 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14 122VU ANTI ICE/PROBES/2/AOA 4DA2 Y13 122VU ANTI ICE/PROBES/2/STATIC 5DA2 Y11 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14 122VU ANTI ICE/PROBES/1/STATIC 5DA1 Z13
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 122VU ANTI ICE/RAIN/RPLNT/F/O  1DB2 W11
 **ON A/C ALL
 123VU Y HYD/ELEC/PUMP  3802GX AB06
 123VU Y HYD/ELEC/ELEC PUMP/NORM  3801GX AB03
 FOR 1000EM1 49VU ENGINE/1/FIRE DET/LOOP A 7WD1 A06 49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04
 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43 121VU ENGINE/ENG1/FIRE DET/LOOP B 8WD1 Q38 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41 122VU ELEC/GCU/1 2XU1 T26
 FOR 1000EM2 49VU ENGINE/2/FIRE DET/LOOP B 8WD2 A07 49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05
 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41 121VU ENGINE/ENG2/FADEC B 4KS2 Q40 121VU ENGINE/ENG2/FIRE DET/LOOP A 7WD2 Q39 122VU ELEC/GCU/2 2XU2 T27
 F 『 EEFF : ALL E Page A48971-51-43
 E E Aug 01/05 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 Subtask 71-51-43-010-065

 C. Get Access
 (1) Open the fan cowls: (Ref. TASK 71-13-00-010-040)
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR


 (2) Put the access platform in position.


 4. Procedure
_________
 **ON A/C 001-049, 051-061, 101-102, 201-202,
 (Ref. Fig. 417/TASK 71-51-43-991-320)
R **ON A/C 062-099, 103-149, 151-199, 203-299, 301-399, 401-499,
 (Ref. Fig. 417A/TASK 71-51-43-991-320-A)
 **ON A/C 001-049, 051-061, 101-102, 201-202,
 Subtask 71-51-43-020-062
 A. Removal of the Fire Detector (Channel B) Harness
 NOTE : To open the flip-lock clamps and line blocks, turn the captive
____ screws or captive bolts 1/4 turn counterclockwise to disengage the cam nuts.
 NOTE : Loosely attach the clamp(s), anti-rotation lug(s) if applicable,
____ and bolt(s) to the brackets from which they were removed to make it easier for installation.
 (1) Disconnect the electrical connector 409VC-A from the pylon junction box. (Ref. Fig. 417/TASK 71-51-43-991-320)

 (2) Open the line blocks (10) that attach the harness (5) to the brackets at station 174 on the top RH side of the engine.

 (3) If necessary, remove the rubber supports from the line blocks (10).


 F 『 EEFF : ALL E Page A49071-51-43
 E E Aug 01/05 E E ECES E E 56-5B E E E (4) Remove the harness (5) from the rubber supports.

 F  『
 E  C F M  E
 E  E

 

 (5) Open the flip-lock clamp (15) and remove the harness (5).
 BEFORE SPIB NO. CFM02255MW1


 (6) Open the line blocks (10) at station 174, the line blocks (20) at station 176, and the line blocks (25) at station 185. (Ref. Fig. 417/TASK 71-51-43-991-320)

 (7) If necessary, remove the rubber supports from the line blocks.

 (8) Remove the harness (5) from the rubber supports.
 