 (20) Put protective covers on the electrical connectors on the harness (30), the hydraulic control unit and the thrust reverser junction box.


 F 『R EEFF : 153-153, E Page 42471-51-43
 E E May 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 **ON A/C ALL
 TASK 71-51-43-400-044
 Installation of the Thrust Reverser (Channel A and B) Harness (4200KS)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)
 No specific Torque Wrench : range 5.00 to 35.00 lbf.in

 (0.05 to 0.40 m.daN)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 31-60-00-860-001 EIS Start Procedure
 70-60-00-910-041 Nacelle Maintenance Practices
 71-13-00-010-040 Opening of the Fan Cowl Doors
 71-13-00-410-040 Closing of the Fan Cowl Doors
 78-31-00-710-042 Operational Test of the Thrust Reverser System

R **ON A/C 001-049, 051-099, 101-149, 151-152, 154-199, 201-299, 301-399, R 401-499,
 71-51-43-991-302 Fig. 403
 F 『 EEFF : ALL E Page 42571-51-43
 E E Aug 01/05 E E ECES E -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


**ON A/C 153-153,
 71-51-43-991-302-A Fig. 403A
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 71-51-43-860-056
 A. Aircraft Maintenance Configuration
 (1) On the center pedestal, on the ENG panel 115VU, make sure that a warning notice is in position to tell persons not to start the engine.

 (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a warning notice is in position to tell persons not to energize the FADEC 1(2).

 (3) Make sure that the access platform is in position.


 Subtask 71-51-43-010-068
 B. Get Access
 (1) Make sure that the fan cowl doors are open: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 F 『R EEFF : ALL E Page 42671-51-43
 E E May 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 Subtask 71-51-43-865-063

 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03 49VU ANTI ICE/PROBES/AOA/1 4DA1 D04 49VU ANTI ICE/PROBES/PITOT/1 3DA1 D02 49VU COM/CVR/SPLY 2RK E14 49VU COM/CVR/CTL 4RK E13
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 49VU ANTI ICE/RAIN/RPLNT/CAPT  1DB1 D01
 **ON A/C ALL
 121VU RCDR/DFDR 7TU K16 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU ANTI ICE/WINDOWS/R 4DG2 W14 122VU ANTI ICE/WINDOWS/L 4DG1 X14 122VU ANTI ICE/PROBES/2/PITOT 3DA2 Y14 122VU ANTI ICE/PROBES/2/AOA 4DA2 Y13 122VU ANTI ICE/PROBES/2/STATIC 5DA2 Y11 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14 122VU ANTI ICE/PROBES/1/STATIC 5DA1 Z13
R  **ON A/C 001-049, 051-052, 054-056, 058-059, 061-099, 101-101, 103-149,
R  151-199, 201-299, 301-399, 401-499, Post SB 30-1037 For A/C 001-049,051-052,054-056,
 122VU ANTI ICE/RAIN/RPLNT/F/O  1DB2 W11
 **ON A/C ALL
 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03 FOR 1000EM1
 F 『 EEFF : ALL E Page 42771-51-43