R (3) TORQUE the nuts (7) to between 0.225 and 0.275 m.daN (19.91 and 24.33
R lbf.in).
R (4) Remove the blanking caps and connect the rotating mechanism connector
R (3) to the connector (1). Make sure that the connector (1) is tight
R on the mount (2).
R 5. Close-up________
R Subtask 32-49-18-410-050
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Install the fan assembly and mounting sleeve (Ref. TASK 32-48-51-400-
R 005).
R Subtask 32-49-18-865-052
R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 1GV.
R Subtask 32-49-18-710-050
R C. Test
R (1) Do an operational test of the tire pressure indicating system
R (Ref. TASK 32-49-00-710-001).
R (2) Do the functional test of the tachometer (Ref. TASK 32-42-00-720-
R 002).
R Subtask 32-49-18-942-050
R D. Removal of Equipment
R (1) Remove the safety barriers.
R (2) Remove the warning notice(s).
R (3) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
DETECTION UNIT - TPIS (2GV) - REMOVAL/INSTALLATION
__________________________________________________ TASK 32-49-34-000-001 Removal of the TPIS Detection Unit (2GV)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 1.8 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 31-32-00-860-009 Procedure to Get Access to the SYSTEM REPORT/TEST/L/G Page 32-49-34-991-001 Fig. 401
3. Job Set-up
__________ Subtask 32-49-34-861-050
A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
1EFF : 051-099, 1 32-49-34Page 401 1 1 May 01/05 1 1 1CES 1 Subtask 32-49-34-810-050
B. Trouble Shooting Data
(1) You can print the Trouble Shooting Data (TSD) as follows:
-get access to the SYSTEM/REPORT/TEST (Ref. TASK 31-32-00-860-009). - on this page, push the line key adjacent to the TPIS indication. - on the TPIS page, push the line key adjacent to the TROUBLE
SHOOTING DATA indication to get the TROUBLE SHOOTING DATA page.
-print the TROUBLE SHOOTING DATA page. Subtask 32-49-34-010-050
C. Get access to the Avionics Compartment
(1) Put the access platform in position at the access door 811.
(2) Open the access door 811. Subtask 32-49-34-865-050
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/TIRE/PRESS 1GV M31
4. Procedure
_________
(Ref. Fig. 401/TASK 32-49-34-991-001) Subtask 32-49-34-020-050
A. Removal of the TPIS Detection Unit
(1)
Loosen the nuts (4).
(2)
Lower the nuts (4).
(3)
Pull the TPIS detection unit (1) on its rack (3) to disconnect the electrical connectors (2).
(4)
Remove the TPIS detection unit (1) from its rack (3).
(5)
Put blanking caps on the disconnected electrical connectors.
1EFF : 051-099, 1 32-49-34Page 402 1 1 May 01/05 1 1 1CES 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架8(66)