• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 23:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3) Put the tachometer (5) and the drive shaft (7) together in position on the motor (32) and install the washers (30) and the screws (31). 

R 1EFF : 301-399, 401-499, 1 32-48-51Page 411 1 1 Aug 01/05 1 1 1CES 1


 (4)
 TORQUE the screws (31) to between 0.2 and 0.25 m.daN (17.69 and 22.12 lbf.in).

 (5)
 Put in position the housing (12) on the motor (32) and install the
 washers (34) and the screws (33).


 (6)
 TORQUE the screws (33) to between 0.25 and 0.3 m.daN (22.12 and 26.54 lbf.in).

 (7)
 Put in position the electrical connector (36) on the housing (12) and install the nut (35).Tighten the nut (35).

 (8)
 Remove the blanking caps.

 (9)
 Connect the connector (3) to the connector (36) and put the plate (2) in position on the housing (12).


 (10)
 Install the screws (4) and TORQUE them to between 0.08 and 0.1 m.daN

 (7.07 and 8.84 lbf.in).

 (11)
 Remove the blanking caps and connect the connector (1) to the tachometer (5).

 (12)
 Apply a thin layer of COMMON GREASE (Material No. 04-022) in the axle along a length of 100 mm (3.9370 in.) approx..

 (13)
 Install the motor assy (6) in the axle. Do not use force. NOTE : Make sure that the pads of the motor assy (6) are in the


____
 correct condition.

 NOTE : During installation, put the electrical cables in the correct
____
 position.

 (14) Attach the motor assy (6) with the bolts (8), the washers (9) and the nuts (10).
 NOTE : Install the bolts (8) so that their heads are turned to the
____
 inner side of the axle.

 (15) TORQUE the nuts (10) to between 0.40 and 0.45 m.daN (35.39 and 39.82 lbf.in) and then safety them with the new cotter pin (11).
R 1EFF : 301-399, 401-499, 1 32-48-51Page 412 1 1 Aug 01/05 1 1 1CES 1 Subtask 32-48-51-420-055


 B. Installation of the Impeller and Shroud Assy
 (1) Install the joint (20) and the collar (23).
 NOTE : The locating pin (24) puts the joint (20) in the correct
____ position. It locks the joint so that it cannot turn on the wheel.
 (2) Install the nut (22) and TORQUE to between 0.28 and 0.34 m.daN (24.77 and 30.08 lbf.in).
 NOTE : The pins (21) set the shroud (19) in the correct position.
____
 (3) Install the shroud (19) on the joint (20) and make sure that the valve is correctly engaged in the grommet.
 NOTE : The shroud (19) must touch the wheel around all its
____
 circumference.

 (4)
 Install the impeller (18)

 -Apply a thin layer of COMMON GREASE (Material No. 04-003) on the drive shaft of the impeller and on the thread of the nut (16).
 -Put the impeller (18) in position. Engage the splines.
 -Install the washer (17) and the nut (16).
 -Lock the impeller (18) with the DISASSEMBLY TOOL (MG174-04) and TORQUE the nut (16) to between 3.1 and 3.4 m.daN (22.86 and 25.07 lbf.ft). Safety the nut with corrosion resistant steel lockwire dia. 0.8 mm (0.03 in.).
 -Make sure that the impeller (18) turns freely.

 (5)
 Clean the splines with CLEANING AGENTS (Material No. 11-002).

 (6)
 Apply a thin layer of COMMON GREASE (Material No. 04-003) on the splines (7) and on the splines of the guard assy.

 (7)
 Install the guard assy (15) on the shroud (19) and the joint (20).


 NOTE : The debris guard has holes of different diameters:
____
 -large diameter (two): to put the locating pins in the correct position. Same holes on the shroud assy (centering function)
 -small diameter (four): to put the four attachment screws in the correct position.
R 1EFF : 301-399, 401-499, 1 32-48-51Page 413 1 1 Aug 01/05 1 1 1CES 1 NOTE : Use the locating pin (21) to put the guard assy (15) in the


____
 correct position.

 NOTE : During the installation, be careful to correctly engage the
____
 splines (7) in the guard assy (15).

 (8) Install the screws (13) and the tab-washers (14) and then TORQUE the screws (13) to between 1.6 and 1.9 m.daN (11.79 and 14.01 lbf.ft).
 (9) Safety the screws (13) with the tab-washers (14). Subtask 32-48-51-865-065
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GS, 2GS, 3GS
 Subtask 32-48-51-710-054
 D. Operational Test
 (1) Do the functional test of the brake fans (Ref. TASK 32-48-00-720-001).
 5. Close-up
________ Subtask 32-48-51-942-054
 A. Put the aircraft back to its initial configuration.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架8(40)