(2)
Make sure that the work area is clean and clear of tool(s) and other items.
RETURN TO SERVICE - INSPECTION/CHECK
____________________________________
TASK 10-30-00-554-005
Return to Operation after Storage Period
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE No specific 1 WARNING NOTICE
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 15-002 USA MIL-B-131 TYPE I BARRIER MATERIAL WATER VAPOR PROOF (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-13-27-612-002 Oil Replenishment of the Flap PCU (6201CM) Gearbox 12-13-27-612-003 Oil Replenishment of the Slat PCU (6001CM) Gearbox 12-13-27-612-005 Drain, Refill and Flush the Flap Actuator Assemblies
With Semi-fluid 12-13-80-610-001 Drain and Replenish Oil System 12-14-32-614-001 Nitrogen Filling of the Tires 12-21-11-615-001 External Cleaning 12-22-27-640-003 Lubrication of Trimmable Horizontal Stabilizer
Actuator Ball Screw Nut 12-22-27-640-004 Lubrication of all Flap Track Carriage Rollers
EFF : ALL 10-30-00Page 601 May 01/05R CES
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-22-27-640-005
12-22-27-640-006
12-22-27-640-007
R 12-22-27-640-008 12-22-32-640-001 12-22-32-640-002 12-22-53-640-001
12-22-55-640-001 12-32-28-281-001 12-32-28-281-003
12-32-28-281-004
R 12-32-29-281-001
20-24-11-100-001 21-21-41-920-002
21-26-00-710-001 21-26-00-710-001 21-28-00-720-003
21-28-00-720-004
23-61-00-200-001
23-71-35-400-001 24-38-51-400-001 24-41-00-861-002
24-41-00-862-002
26-12-00-710-001 26-21-00-710-002
R 26-21-00-720-003 26-21-41-400-004
26-22-00-210-001 Lubrication of Spoiler No.1 to 5 Servo Control BearingsLubrication of all Slat Track Rollers, Pinion Bearings, Pinions and Rack TeethLubrication of the THS Mechanical Control Chains Remove Flap Rotary Actuators For RegreasingLubrication of the MLG and DoorsLubrication of the NLG and DoorsLubrication of Trimmable Horizontal Stabilizer Bearings and Attachment FittingsLubrication of the Rudder Bearing No. 6Drain Water ContentSample Fuel for Microbiological Contamination AnalysisFuel Sampling for a Microbiological Contamination Test with a Microb Monitor Test Kit (OBSOLETE)Hydraulic Fluid Sample of Green,Blue and Yellow Systems for AnalysisCleaning and Protection of the CablesScheduled Replacement of the Recirculation Filter 4012HM (4013HM)Operational Check of System via MCDUOperational Check of System via MCDUFunctional Test of the FWD Cargo-Compartment Ventilation-SystemFunctional Test of the AFT Cargo-Compartment Ventilation-System
-Check Resistance of Tip to Retainer - Check Bonding of Retainer to StructureInstallation of the Cockpit Voice Recorder (CVR) 1RKInstallation of the Batteries (2PB1, 2PB2)Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External PowerOperational Check of Loop/SquibOperational Check of Bottle Low Pressure Indicating Circuit Check Distribution Piping for Leakage and ObstructionInstallation of the Cartridge of the Engine Fire-Extinguisher BottleInspection of the APU Fire-Extinguishing Distribution Piping
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
26-22-00-710-001
26-22-00-710-003
R R 26-22-41-400-001 26-23-00-200-001 26-23-00-710-001
26-23-41-000-004
R 26-24-00-210-001 26-25-00-600-001
27-14-00-710-001
27-24-00-710-002
27-34-00-710-001
27-54-00-200-001
27-54-00-710-001 27-64-00-710-001 27-84-00-200-001
R R R R 28-11-00-280-002 28-11-00-600-004 28-11-00-600-004 28-11-00-600-004 28-11-00-600-004 28-23-00-720-001
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PARKING, MOORING, STORAGE & RETURN TO S(47)