Half Plug
Figure 204/TASK 10-11-00-991-005
EFF : ALL 10-11-00 Page 247
Aug 01/05
CES
Protective Equipment
Figure 205/TASK 10-11-00-991-006
EFF : ALL 10-11-00 Page 248
Aug 01/05
CES
PARKING - INSPECTION/CHECK
__________________________ TASK 10-11-00-200-002 Periodic Ground Check at 7-day Intervals
1. Reason for the Job
__________________
This procedure gives the periodic ground check at 7-day intervals for a parking period of not more than 15 days or of not more than 12 weeks (aircraft in flight-ready condition).
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-10-00-200-001 Check Fluid Level on Reservoir Indicators 32-41-00-210-003 Inspection/Check of the Pressure of Tires
3. Job Set-up
__________ Subtask 10-11-00-941-052
A. Not Applicable
4. Procedure
_________ Subtask 10-11-00-210-063
A. Inspection
(1)
Do a general visual inspection of the airframe from the ground for correct condition.
(a)
Make sure that the protective equipments are correctly installed.
(b)
Make sure that there are no leaks from:
-
the wings
-
the lower fuselage
-
the landing gears
-
the engines
-
the APU
-
the horizontal and vertical stabilizer.
(c)
Make sure that there are no signs of bird nesting in all areas of the aircraft to which birds have access.
(d)
Do a check for bird excrements. If there are birds excrements, remove them.
(e)
Do a check of the outer skin for contamination that is not usual.
(2)
Make sure that the extension of landing gear shock absorbers is correct.
(3)
Do a check of the tire pressure (Ref. TASK 32-41-00-210-003).
(4)
Do a check of the hydraulic reservoir level (Ref. TASK 29-10-00-200-001).
TASK 10-11-00-200-003
Periodic Groung Check at 15-day Intervals
1. Reason for the Job
__________________
This procedure gives the periodic ground check at 15-day intervals for a parking period of not more than 12 weeks (aircraft in flight-ready condition).
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
10-11-00-555-013 Protection Equipment for Parking or Storage Procedure 12-33-21-618-001 Pre-conditioning with the APU 24-38-51-000-001 Removal of the Batteries (2PB1, 2PB2) 24-38-51-400-001 Installation of the Batteries (2PB1, 2PB2) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation 27-50-00-866-008 Extension of the Flaps/Slats on the Ground 27-92-41-710-001 Operational Test of the Side Stick Assembly 29-10-00-200-001 Check Fluid Level on Reservoir Indicators 30-11-00-710-001 Operational Test of the Wing Ice-Protection System 30-21-00-710-002 Operational Test of the Engine Air Intake Ice
Protection (with the Engines in operation) 32-41-00-210-002 Inspection/Check of the Wheels and Tires 32-41-00-210-003 Inspection/Check of the Pressure of Tires 32-42-00-710-001 Operational Check of the Normal Braking System 32-43-00-710-001 Operational Check of Alternate Braking System 32-48-00-720-001 Functional Test of the Brake Fans 32-51-00-720-003 Functional Test of the Nose Wheel Steering with the
Handwheel. 32-51-00-720-004 Functional Test of the Nose Wheel Steering with the Pedals.
36-11-00-710-003 Operational Test of the Bleed Air System
R 49-00-00-860-003 APU Start by Batteries (GTCP 36-300)
R 49-00-00-860-004 APU Shutdown by Batteries (GTCP 36-300) 49-00-00-860-005 APU Start by Batteries (APS 3200) 49-00-00-860-006 APU Shutdown by Batteries (APS 3200) -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PARKING, MOORING, STORAGE & RETURN TO S(17)