R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE  QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific  1 ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE 
R  3. Job Set-up__________ 
R  Subtask 10-12-00-941-053 
R  A. Put an ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE in position near the 
R  aircraft. 
R  4. Procedure_________ 
R  Subtask 10-12-00-210-071 
R  A. Visual Inspection 
R  (1) Do a general visual inspection of the airframe from the ground for 
R  correct condition. 
R  (2) Make sure that there is no bird nest. If you find bird nests, remove 
R  them and clean the aircraft surface around the bird nest. 
R  (3) Make sure that there are no leaks: 
R  - at the engine drain masts 
R  - on the wheels and landing gears 
R  - from the wings 
R  - from the APU 
R  - from the horizontal and vertical stabilizer. 
R  (4) Make sure that the protection cover/plugs are correctly installed. 
R  (5) Do a check of the outer skin for contamination that is not usual.

 


R 5. Close-up________
R Subtask 10-12-00-942-058
R A. Remove the access platform(s).


R TASK 10-12-00-200-007


R  Periodic Ground Check at 15-day Intervals 
R  1. Reason for the Job__________________ 
R  To do a check of the condition of the aircraft during the storage period. 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE  QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific  1 ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE 
R  B. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE  DESIGNATION 
R  -------------------------------------------------------------------------------
R  12-24-34-600-001  Bleeding of the Standby Air Data System 
R  12-32-28-281-001  Drain Water Content 
R  32-41-00-210-002  Inspection/Check of the Wheels and Tires 
R  32-41-00-210-003  Inspection/Check of the Pressure of Tires 
R  3. Job Set-up__________ 
R  Subtask 10-12-00-941-054 
R  A. Put an ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE in position near the 
R  aircraft. 
R  4. Procedure_________ 
R  Subtask 10-12-00-553-069 
R  A. Move the Aircraft 
R  NOTE : if old tires are installed, do not do this procedure.____ 

R  (1) Remove the wheel chocks that you installed during the storage 
R  procedure.

 


R  (2) Move the aircraft, by a 1/4 turn of the wheels, to prevent damage to 
R  the tires. 
R  (3) Put the wheel chocks in position: 
R  (a) For the NLG: 
R  - in front of and behind the wheels. 
R  (b) For the MLG: 
R  - in front of the wheels and behind the wheels. 
R  Subtask 10-12-00-210-072 
R  B. Visual Inspection 
R  (1) Make sure that there is no fuel leak. 
R  (2) Examine the condition of the wheels and the tires (Ref. TASK 32-41-
R  00-210-002). 
R  (3) Do a tire pressure check, if necessary inflate the tires (Ref. TASK 
R  32-41-00-210-003). 
R  Subtask 10-12-00-170-055 
R  C. Drain the Standby Static Line 
R  (1) Remove the water from the standby static line (Ref. TASK 12-24-34-
R  600-001). 
R  Subtask 10-12-00-680-055 
R  D. Inspection of the Fuel Tanks 
R  (1) Drain water from the fuel tanks (Ref. TASK 12-32-28-281-001). 
R  5. Close-up________ 
R  Subtask 10-12-00-942-059 
R  A. Put the aircraft back to its initial configuration. 
R  (1) Remove the access platform(s).
 