R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 10-11-00-942-056
 A. Close-up.
 (1)
 Close all the pressurized access doors.

 (2)
 Close the passenger/crew doors (Ref. TASK 52-10-00-410-001).

 (3)
 Close the FWD and aft cargo-compartment doors (Ref. TASK 52-30-00-860-002).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (5)
 Make an entry in the aircraft log book or attach a tag on the captain side stick to tell the crew that protection covers/devices are installed.

 

 

 **ON A/C 301-399,
 Subtask 10-11-00-942-056-B
 A. Close-up.
 (1)
 Close all the pressurized access doors.

 (2)
 Close the emergency exit doors (Ref. TASK 52-22-00-410-001).

 (3)
 Close the passenger/crew doors (Ref. TASK 52-10-00-410-001).

 (4)
 Close the FWD and aft cargo-compartment doors (Ref. TASK 52-30-00-860-002).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (6)
 Make an entry in the aircraft log book or attach a tag on the captain side stick to tell the crew that protection covers/devices are installed.


 **ON A/C ALL
 Subtask 10-11-00-555-068
 B. Periodic Checks and Return to Operation
 (1)
 During the parking period, do the periodic checks:

 -
at 7-day intervals (Ref. TASK 10-11-00-200-002).

 -
at 15-day intervals (Ref. TASK 10-11-00-200-003).

 -
at 1-month intervals (Ref. TASK 10-11-00-200-004).

 

 (2)
 For return to operation, do the return to operation procedure (Ref. TASK 10-11-00-554-004).

 (3)
 You can do the reweval procedure on time (Ref. TASK 10-11-00-555-012).


 EFF : ALL  10-11-00Page 225   May 01/05R   CES


 TASK 10-11-00-554-003

 

 Return to Operation after Parking not more than 15 Days
 1. Reason for the Job
__________________
 This procedure gives the instructions necessary to operate again an aircraft after a parking period of not more than 15 days.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice No specific 1 ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-14-32-614-003 Check Charge Pressure of Main Landing Gear Shock
 Absorber 12-14-32-614-004 Check Shock Absorber Charge Pressure 12-21-11-615-001 External Cleaning 12-32-28-281-001 Drain Water Content 24-38-51-400-001 Installation of the Batteries (2PB1, 2PB2) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 32-41-00-210-003 Inspection/Check of the Pressure of Tires 34-10-00-170-001 Flushing of the Principal Total Pressure Lines 34-10-00-170-002 Flushing of the Principal Static Pressure Lines 34-10-00-170-003 Draining and Flushing of Standby Pneumatic Circuits 34-22-25-170-001 Draining and Flushing of the Standby Static and
 Standby Total Pressure lines (ISIS)
 EFF : ALL  10-11-00Page 226   May 01/05R   CES

 

 3. Job Set-up
__________ Subtask 10-11-00-615-055
 A. Safety Precautions
 (1)
 Put an ACCESS PLATFORM 15M (49 FT) - ADJUSTABLE in position near the aircraft.

 (2)
 Put a warning notice in position in the cockpit to tell persons not to operate the systems while you prepare the aircraft for operation again.


 4. Procedure
_________ Subtask 10-11-00-860-076
 A. Aircraft Configuration
 (1)
 Do a general visual inspection of the airframe from the ground for correct condition.

 (a) Make sure that there are no leaks from:
 -
the wings

 -
the lower fuselage

 -
the landing gear

 -
the engines

 -
the APU

 -
the horizontal and vertical stabilizers.
 