MAINTENANCE MANUAL
3. FLEX DUCTS 
RECIRCULATION AIR CHECK VALVE
Recirculation Air Check Valve Installation 
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-25-03
 ALL  ú ú 02 Page 402 ú Jun 20/90 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
757 
MAINTENANCE MANUAL
 (b)  Put a DO-NOT-OPERATE tag on the switch-light.
 S 864-034
 (4)  
Remove electrical power (AMM 24-22-00/201).
S 014-008
 (5)  
To remove the right check valve, remove the access panel for the right recirculation filter.
 NOTE: The access panel is on the aft bulkhead of the forward cargo
____
 compartment.
 S 014-009
 (6)  
To remove the left check valve, remove the left sidewall lining panel, approximately 5-6 feet (1.5-2.0 meters) aft of the forward end of the forward cargo compartment (AMM 25-50-02/401).
 D. 
Remove the Check Valve
 S 034-012
 (1)  
Remove the clamps from the check valve (4 locations).
S 034-013
 (2)  
Move the flexible ducts away from the check valve.
S 024-014
 (3)  
Remove the check valve.
S 434-015
 (4)  
Put a cover on the duct openings.
 TASK 21-25-03-404-016
 3. Install the Recirculation Air Check Valve (Fig. 401)
_________________________________________
 A. Parts
 (1)  Refer to the Airplane Illustrated Parts Catalog (AIPC) for the numbers and effectivities of the items in this table:
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 21-25-03
 ALL  ú ú 12 Page 403 ú Jan 28/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
757 MAINTENANCE MANUAL
 ~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT | FIG | ITEM | ................................................................................ | 401 | 1 | Clamp (Right Side) | 21-25-01 | 10 | 135J | | | 2 | Check Valve (Right Side) | | | 145J | | | 3 | Hose (Right Side) | | | 140 | | 401 | 1 | Clamp (Left Side) | 21-25-05 | 01 | 85 | | | 2 | Check Valve (Left Side) | | | 100 | | | 3 | Flexible Hose (Left Side) | | | 95 | 2........…......…...................................…...........….......…......1
 B. References
 (1)  
AMM 06-46-00/201, Entry, Service and Cargo Doors Access Doors and Panels
 (2)  
AMM 24-22-00/201, Electric Power Control
 (3)  
AMM 25-50-02/401, Sidewall Lining Panels
 (4)  
AMM 25-50-03/401, Bulkhead Lining
 C. 
Access
 (1)  
Location Zones 121 Forward cargo compartment (Left) 126 Area aft of forward cargo compartment (Right)
 D. 
Install the Check Valve
 S 034-017
 (1)  
Remove the covers from the duct openings.
S 424-018
 (2)  
Put the check valve into position in the ducts.
 (a)  
Make sure the flow arrow points to the mix manifold.
 S 434-019
 (3)  
Move the flexible ducts on to the check valve.
 (4)  
Install the clamps on the check valve (4 locations).
S 434-021
 (5) 
Tighten the screw on the clamps to 20 to 25 pound-inches.
 E. 
Do the installation test for the check valve.
 (1)  
Supply electrical power (AMM 24-22-00/201).
S 864-022
 (2)  
AIRPLANES WITH PASSENGER CONFIGURATION; Remove the DO-NOT-OPERATE tag from the applicable (L or R) RECIRC FAN switch-light.
 (a)  
Push the switch-light to the on position.
 S 434-020
 S 864-035
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 