• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 07:49来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

____________________________________________________
 1.  General_______
 A. This procedure has instructions to do the tasks that follow:
 (1)  
Remove the Cabin Pressure Outflow Valve

 (2)  
Install the Cabin Pressure Outflow Valve

 (3)  
Clean the Cabin Pressure Outflow Valve

 (4)  
Do a Check of the Cabin Pressure Outflow Valve


 TASK 21-31-03-002-001
 2.  Remove the Cabin Pressure Outflow Valve (Fig. 201)_______________________________________
 A. General
 (1)  
You can remove the outflow valve through the aft end of the bulk cargo compartment or from the out side of the airplane. The valve is most easily removed through the cargo compartment. The procedure to remove the valve from the out side of the airplane is used when access through the bulk cargo compartment is not possible.

 (2)  
To remove the valve from the out side of the airplane, the valve must be in the closed position.

 B.
References

 (1)  
AMM 24-22-00/201, Electric Power Control

 (2)  
AMM 06-46-00/201, Entry, Service and Cargo Doors Access Doors and Panels

 (3)  
AMM 25-50-03/401, Bulkhead Lining

 C.
Access

 (1)  
Location Zones
 165 Area aft of bulk cargo compartment (Left)


 D.
Prepare for the Removal


 S 862-002
 (1)  
Open these circuit breakers, on the overhead circuit breaker panel P11, and attach the DO-NOT-CLOSE tags:

 (a)  
11B14, CABIN ALTITUDE CONTROL MANUAL

 (b)  
11B15, CABIN ALTITUDE CONTROL SELECT

 (c)  
11N15, CABIN ALTITUDE CONTROL AUTO 1

 (d)  
11N24, CABIN ALTITUDE CONTROL AUTO 2


 S 012-003
 (2)  
If the outflow valve will be removed through the bulk cargo compartment, do the steps that follow:

 (a)
Open the aft cargo door, 822 (AMM 06-46-00/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-03
 ALL  ú ú 03 Page 201 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

2. GEARBOX  4. DC MOTOR 
ELECTRICAL 
CONNECTOR 
3. AC MOTORS 
SEE  A  5. POTENTIOMETER 
1. AC MOTORS ELECTRICAL  ELECTRICAL 
CONNECTORS  CONNECTOR 
6. DC MOTOR AND 
POTENTIOMETER 
9. BONDING JUMPER 
7. ACTUATOR SUPPORT 
FRAME 
8. ACTUATOR BOLT 
15. FLAPPER DOORS  (2 PLACES) 

14. INNER SKIN  A 
13. VALVE  INBD  FWD  10. SCREW 11. WASHER 12. NUT 

FRAME 20. VALVE  (22 PLACES) 16. NUT PLATE  1  TORQUE SCREWS TO 35-40 IN-LBS. 
17. GASKET 

19. AIRPLANE 18. SCREWS (22 PLACES) 1
OUTER SKIN
A-A
Cabin Pressure Outflow Valve Installation Figure 201
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-03
 ALL  ú ú 01 Page 202 ú Mar 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (b)  Remove the endliner at the aft end of the bulk cargo compartment (AMM 25-50-03/401).
 S 862-004
 (3)  
If you will remove the valve from the out side of the airplane, make sure that the valve is in the closed position.

 (a)  
If the valve cannot be closed, you must remove the valve through the bulk cargo compartment.

 E.
Remove the outflow valve.


 S 032-005
 (1)
Remove the screws (18) that are on the out side of the airplane.

 S 032-006

 (2)  
Disconnect the bonding jumper (9) from the valve (13).

 (a)  
To access the bonding jumper from the out side the airplane, carefully push the forward edge of the valve (13) inboard.


 S 032-007
 (3)  
Disconnect the electrical connectors (1) from the valve motors (3). Identify the electrical connectors for installation.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 空调 AIR CONDITIONING 1(102)