• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 07:49来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Open these circuit breakers on the overhead circuit breaker panel, P11, and attach DO-NOT-CLOSE tags:

 (a)  
11B15, CABIN ALTITUDE CONTROL SELECT

 (b)  
11N15, CABIN ALTITUDE CONTROL AUTO 1

 (c)  
11N24, CABIN ALTITUDE CONTROL AUTO 2


 S 014-003
 (2)  
Open the forward (No. 1) cargo door, 821, (AMM 06-41-00/201) and find the automatic pressure controller on the E5 rack.

 (3)
Remove the automatic pressure controller (AMM 20-10-01/401).


 S 024-004
 TASK 21-31-02-404-005
 3.  Install the Automatic Pressure Controller (Fig. 401)_________________________________________
 A.  References
 (1)  AMM 06-41-00/201, Fuselage Access Doors and Panels
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-02
 ALL  ú ú 02 Page 401 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL


BITE INSTRUCTIONS PRESS TEST COMPONENT CONTROLLER AC MOTOR SELECTOR LDG GEAR SW STATUS NO FAULT AC POWER OFF LOW INFLOW VERIFY RESET CABIN PRESSURE VERIFY MODE BIT 

 

A

Automatic Pressure Controller Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-02
 ALL  ú ú 01 Page 402 ú Jun 15/82
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (2)  
AMM 20-10-01/401, E/E Rack Mounted Components

 (3)  
AMM 24-22-00/201, Electrical Power Control

 B.
Access

 (1)  
Location Zones
 211/212 Control Cabin - Section 41
 821 Forward Cargo Door


 C.
Procedure


 S 424-006
 (1)  
Install the automatic pressure controller (AMM 20-10-01/401).

 S 864-007

 (2)  
Remove the DO-NOT-CLOSE tags and close these circuit breakers on the P11 panel:

 (a)  
11B15, CABIN ALTITUDE CONTROL SELECT

 (b)  
11N15, CABIN ALTITUDE CONTROL AUTO 1

 (c)  
11N24, CABIN ALTITUDE CONTROL AUTO 2


 S 704-008
 (3)  
Do a test of the automatic pressure controller.

 (a)  
Supply electrical power (AMM 24-22-00/201).

 (b)  
Set the MODE SELECT switch on the pilot's overhead panel, P5, to AUTO 1 or AUTO 2.

 (c)  
Wait approximately two minutes.

 (d)  
Push the PRESS/TEST button on the installed automatic pressure controller. 1) Make sure all eight lights (seven red and one green) come


 on.
 NOTE: Lights will stay on while you push the button.
____
 (e)  
Push the VERIFY switch. 1) Make sure the VERIFY MODE lamp comes on and then goes out.

 (f)  
Push the VERIFY switch again. 1) Push the RESET button while the VERIFY MODE lamp is on.

 (4)  
Close the forward (No. 1) cargo door, 821 (AMM 06-41-00/201).


 S 414-009
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-02
 ALL  ú ú 02 Page 403 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 S 864-010
 (5) Remove electrical power, if it is not necessary.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-31-02
 ALL  ú ú 01 Page 404 ú Jun 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 CABIN PRESSURE OUTFLOW VALVE - MAINTENANCE PRACTICES
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 空调 AIR CONDITIONING 1(101)