• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 07:49来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 ú  limit valve.
 ú  (a) Make sure the VERIFY light comes on. (This test can take up to
 ú  three minutes to complete.)
 ú
 ú  S 745-621
 ú  (10) Push the RESET button while the VERIFY and GO lights are still on.
 ú  (a) Make sure the RESET light comes on for 6 to 10 seconds and the
 ú  VERIFY and GO lights go off.
 S 745-211
 (11) Do the BITE test on the other pack temperature controller.
 E.  Pack Standby Temperature Controller BITE Test:
 NOTE: This test electrically tests the standby pack controller,____
 standby temperature sensor, and standby compressor outlet sensor.
 S 865-193
 (1) Move the L and R PACK selectors on the P5 panel, to STBY-N.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-00
 ALL  ú ú 03.1 Page 508 ú Sep 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
 S 745-212
 (2)  Do these steps for all seven (7) positions of the test selector on the pack standby controller:
 NOTE: Position "1" through position "5" detects internal faults
____ in the standby pack temperature controller. These faults include power supply problems and current output problems.
 Position "6" detects out of range faults in the pack temperature sensor.
 Position "7" detects out of range faults in the compressor discharge temperature sensor.
 (a)  
Turn the test selector to the applicable position.

 (b)  
Push the test selector.

 (c)  
Make sure the GO lights come on.

 (d)  
If a NO-GO light comes on, then replace the applicable unit.


 S 745-213
 (3)  
Turn the test selector to position 1.

 F.
Put the airplane back to its usual position:


 S 415-192
 (1)  
Close the access door for the main equipment center, 119BL (AMM 06-41-00/201).

 S 865-160

 (2)  
Move the L and R PACK selectors on the P5 panel to OFF.

 (a)  
Make sure the L (R) PACK OFF light comes on.


 S 865-161
 (3)  Remove the electrical power if it is not necessary (AMM 24-22-00/201).
 TASK 21-51-00-715-158
 3.  Operational Test - Pack Temperature Control (Fig. 501, 502)___________________________________________
 A. General
 (1)  
This task has the steps to make sure the ram air doors and the temperature control valve operate correctly.

 B.
References

 (1)  
AMM 24-22-00/201, Electric Power - Control

 (2)  
AMM 27-61-00/201, Spoiler/Speedbreak Control System

 (3)  
AMM 32-09-02/201, Air/Ground Relays

 C.
Prepare for the test:


 S 865-391
 (1)  GUN 006-999;
 Make sure these circuit breakers are closed:

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-00
 ú  ALL  ú
 ú ú  ú 13.101 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 509Sep 28/02 

A

757 MAINTENANCE MANUAL
 (a)  Overhead Circuit Breaker Panel, P11:
 1) 11A13, AIR COND PACK LEFT AUTO CONT
 2) 11A14, AIR COND PACK LEFT FLOW CONT
 3) 11A15, AIR COND RIGHT STANDBY CONT
 4) 11A26, AIR COND LEFT STANDBY CONT
 5) 11A28, AIR COND PACK RIGHT AUTO CONT
 6) 11A29, AIR COND PACK RIGHT FLOW CONT
 7) 11M11, LEFT PACK AUTO POWER
 8) 11M15, RIGHT PACK STANDBY POWER
 9) 11M19, RIGHT PACK AUTO POWER
 10) 11M24, LEFT PACK STANDBY POWER

 S 865-183
 (2)  
GUN 001-005;
 Make sure these circuit breakers are closed:


 (a)  
Overhead Circuit Breaker Panel, P11:
 1) 11M10, LEFT PACK AUTO POWER
 2) 11M11, LEFT PACK AUTO CONT
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 空调 AIR CONDITIONING 1(184)