• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 07:49来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Operation  8
 Component Location  101  ALL
 Component Index
 Component Location
 Adjustment/Test  501  ALL
 Adjust the Actuators of the  501
 Ram-Air
 Operational Test - Ram-Air  501
 System
 System Test - Ram-Air System  503
 ACTUATOR - RAM AIR EXHAUST DOOR 21-53-04
 Removal/Installation  401  ALL
 (TASK ORIENTED DATA)  401
 ACTUATOR - RAM AIR INLET DOOR 21-53-03
 Removal/Installation  401  ALL
 (TASK ORIENTED DATA)  401
 ASSEMBLY - TEMPERATURE CONTROL 21-53-06
 CARD
 Removal/Installation  401  ALL
 DOOR - RAM AIR EXHAUST 21-53-02
 Removal/Installation  401  ALL
 (TASK ORIENTED DATA)  401

 21-CONTENTS
 GUN Page 14 May 28/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL CHAPTER 21 - AIR CONDITIONING TABLE OF CONTENTS
_________________
 Chapter
 Section
 Subject_______  Subject_______  Page____ 
DOOR - RAM AIR INLET  21-53-01
 Removal/Installation  401 
(TASK ORIENTED DATA)  401
 NOZZLE - WATER SPRAY  21-53-05
 Removal/Installation  401 
Inspection/Check  601 
(TASK ORIENTED DATA)  601
 EQUIPMENT COOLING SYSTEM  21-58-00
 Description and Operation  1 
General  1
 Equipment Cooling System  1
 Component Details  4
 Equipment Cooling Air  9
 Cleaner
 Equipment Cooling Air Fan  9
 Equipment Cooling Low Flow  9
 Sensor
 Equipment Cooling Smoke  10
 Sensor
 Fan Check Valve  4
 Overboard Exhaust Valve  4
 Operation  10
 Functional Description  10
 Component Location  101 
Component Index
 Component Location
 Maintenance Practices  201 
Equipment Cooling for High  201
 Ambient Temperatures or High
 Altitudes
 Equipment Cooling Rack  205
 Balancing Procedure
 Equipment Cooling Rack  202
 Pressure Test
 Adjustment/Test  501 
Operational Test - Equipment  501
 Cooling System
 System Test - Equipment  511
 Cooling System

EffectivityALLALL
ALLALL
ALLALL
ALL
 21-CONTENTS
 GUN Page 15 May 28/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
 CHAPTER 21 - AIR CONDITIONING
 TABLE OF CONTENTS_________________
 Chapter
 Section
 Subject Subject_______ _______  Page____  Effectivity___________
 CLEANER - EQUIPMENT COOLING AIR 21-58-21
 Maintenance Practices  201  ALL
 Clean Equipment Cooling Air  203
 Cleaner
 Install the Forward  204
 Equipment Cooling Air
 Cleaner
 Remove the Forward Equipment  201
 Cooling Air Cleaner
 FAN - EQUIPMENT COOLING AIR 21-58-06
 Removal/Installation  401  ALL
 FAN - EQUIPMENT COOLING 21-58-22
 AUXILIARY
 Removal/Installation  401  [*]
 Do a Test of the Auxiliary  403
 Fan
 Install Equipment Cooling  401
 Auxiliary Fan
 Remove the Equipment Cooling  401
 Auxiliary Fan
 [*] GUN 006-999
 SENSOR - EQUIPMENT COOLING SMOKE 21-58-19
 Maintenance Practices  201  ALL
 Forward Equipment Cooling  204
 Smoke Detector Cleaning
 Forward Equipment Cooling  205
 Smoke Detector Installation
 Forward Equipment Cooling  207
 Smoke Detector Operational
 Test
 Forward Equipment Cooling  201
 Smoke Detectors Removal
 SENSORS - EQUIPMENT COOLING LOW 21-58-17
 FLOW
 Maintenance Practices  201  ALL
 Equipment Cooling Low Flow  204
 Sensor Cleaning
 Replace the Equipment  201
 Cooling Low Flow Sensor
 VALVE - EQUIPMENT COOLING FAN 21-58-02
 CHECK
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 空调 AIR CONDITIONING 1(6)