 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 101-105, 107-107, 151-199, ∞∞49-00-81∞∞∞∞∞∞∞∞∞∞Page B200
 201-210, Config-1 Aug 01/05 CES


 - do a check for damage/contamination of electrical connector P12 of the LOAD CONTROL VALVE (8050KM).
 (1) If the electrical connector P12 is damaged/contaminated:

 - do a repair/cleaning.

 (2) If the electrical connector is OK:


 - replace the LOAD CONTROL VLV (8050KM) (Ref. AMM TASK 49-51-51-000-004) and (Ref. AMM TASK 49-51-51-400-004).
 (a) If the fault continues:
 - do a check and repair of the aircraft wiring from the ECB (59KD) AB/F10,D7,D14 to the LOAD CONTROL VALVE (8050KM) P12/1,3,4 the LOAD CONTROL VALVE (8050KM) P12/2 to GND (Ref. ASM 49-61/01).
 1 If the fault continues:
_
 - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-003) and (Ref. AMM TASK 49-61-34-400-003).
R **ON A/C 001-049, 101-105, 107-107, 151-199, 201-210,
 B. Do the test given in para. 3.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 101-105, 107-107, 151-199, ∞∞49-00-81∞∞∞∞∞∞∞∞∞∞Page B201
 201-210, Config-1 Aug 01/05 CES

 TASK 49-00-81-810-862


 "APU AVAIL"- Signal Fault (131-9(A))
 1. Possible Causes
_______________
 - APU AVAILABLE SHOWS CIRCUIT FAILURE

 - ANNUNCIATOR-LIGHT TEST AND INTERFACE-BOARD (7LP)

 - aircraft wiring

 - ECB (59KD)


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
AMM 33-14-00-710-001  Operational Test of the Annunciator Light Test System in the Cockpit
 AMM 33-14-33-000-001  Removal of the Annunciator-Light Test and Interface-Board (1LP, 2LP, 3LP, 4LP, 5LP, 6LP, 7LP, 8LP, 9LP, 10LP, 11LP, 12LP, 18LP, 19LP, 20LP)
 AMM 33-14-33-400-001  Installation of the Annunciator-Light Test and Interface-Board (1LP, 2LP, 3LP, 4LP, 5LP, 6LP, 7LP, 8LP, 9LP, 10LP, 11LP, 12LP, 18LP, 19LP, 20LP)
 AMM 49-61-34-000-003 Removal of the Electronic Control Box (ECB) (131-9(A)) AMM 49-61-34-400-003 Installation of the Electronic Control Box (ECB) (131-9(A)) ASM 49-61/01
 3. Fault Confirmation
__________________
 A. Read-out of ECB Trouble-Shooting Data
 (1) Put the APU MASTER SW to the ON position.

 (2) Get access to the APU LAST LEG/PREVIOUS LEG report.

 (3) Push the '>'-key adjacent to the related CFDS failure message.

 (4) If the MCDU menu shows:
 APU AVAILABLE SHOWS CIRCUIT FAILURE

 

 - do the Fault Confirmation that follows:
 (a) Get access to the APU GND SCANNING menu.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 101-105, 107-107, 151-199, ∞∞49-00-81∞∞∞∞∞∞∞∞∞∞Page B202
 201-210, Config-1 Aug 01/05 CES 4. Fault Isolation


_______________
 A. If the APU GND SCANNING menu gives the maintenance message:
 WRG: APU AVAILABLE
 associated with Fault Code Number (FCN) 130
 - do the Operational Test of the Annunciator Light Test System in the Cockpit (Ref. AMM TASK 33-14-00-710-001).
 (1) If the AVAIL/ON annunciator lights on the APU START P/B (2KA) on the panel 25VU do not come ON:

 - replace the ANNUNCIATOR-LIGHT TEST AND INTERFACE-BOARD (7LP) (Ref. AMM TASK 33-14-33-000-001) and (Ref. AMM TASK 33-14-33-400-001).
 (a) If the fault continues:
 - replace the APU START P/B (2KA).

 (2) If AVAIL/ON annunciator lights on the APU START P/B (2KA) come ON:

 - do a check and repair of the aircraft wiring from the ECB (59KD) AB/J6 to the RELAY-APU AVAIL (6KD) A/X1 and the RELAY-ANNUNCIATOR-LIGHT TEST AND INTERFACE-BOARD (7LP) A/21 (Ref. ASM 49-61/01).

 (3) If the fault continues:


 - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-003) and (Ref. AMM TASK 49-61-34-400-003).
 B. Do the test given in para. 3.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 101-105, 107-107, 151-199, ∞∞49-00-81∞∞∞∞∞∞∞∞∞∞Page B203
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 机载辅助动力 2(111)