(40)
from the location of the aft datum side-roller.
(b)
Set the micrometer (42) on the gage block (44) to zero.
(c)
Install the gage assembly (40) on the gage block (44) and lock it in position with the clamps (41).
(d)
Move the micrometer (42) in the gage block (44) until it touches the gage assembly (40). Lock the micrometer (42) in position with the screw (43).
(e)
Remove the gage assembly (40) from the gage block (44).
(f)
Install the serviceable datum side-roller (20) on the gage block
(44)
and lock it in position with the clamps (41).
(g)
Adjust the micrometer (42) until it touches the datum side-roller (20). Write down the dimension shown on the micrometer (42).
(h)
Use an external micrometer to calculate the dimensions for the shims (23) from the data written down.
(i)
Remove the datum side-roller (20) from the gage block (44).
(j)
Keep the side-roller (20) and its shims (23) together.
(k)
Do the procedure again for the forward datum side-roller.
(6) Remove the clamp assemblies (36) and the setting track (35). Subtask 27-84-62-420-051
B. Installation of the Datum Side-Rollers NOTE : This procedure is only necessary where all the side-rollers are
____
removed.
(1)
For tracks 5 and 11, prepare the aft datum side-roller (20) for electrical bonding (Ref. TASK 20-28-00-912-004).
(2)
For tracks 6, 7, 8, 9, 10 and 12, apply a thin layer of COMMON GREASE (Material No. 04-024) to the interface of the datum side-rollers (20) and the shims (23).
(3)
Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-019) to the shanks of the bolts (21).
(4)
Put the necessary thickness of shims (23) and the aft datum side-roller (20) in position.
(5)
Install the shims (23) and the aft datum side-roller (20) with the washers (22) and the bolts (21).
(6)
For tracks 8 and 11, where applicable, safety the bolts (21) with MISCELLANEOUS (Material No. 19-010).
(7)
Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the bolts (21), the washers (22) and the shims (23).
(8)
Do the procedure again for the front datum side-roller (20).
(9)
If removed, install the applicable slat track (2) (Ref. TASK 27-84-62-400-001).
Subtask 27-84-62-420-052
C. Installation of One Side-Roller or a Pair on the Same Side
(1)
For tracks 5 and 11, prepare the side-roller(s) (20) for electrical bonding (Ref. TASK 20-28-00-912-004).
(2)
For tracks 6, 7, 8, 9, 10 and 12, apply a thin layer of COMMON GREASE (Material No. 04-024) to the interface of the side-roller(s) (20) and the shims (23).
(3)
Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-019) to the shanks of the bolts (21).
(4)
Put the shims (23) and the side-roller(s) (20) in position.
(5)
Install the shims (23) and the side roller(s) (20) with the washers
(22) and the bolts (21).
Subtask 27-84-62-820-059
D. Adjustment of the Side Rollers
(1)
Move the applicable track (2) through its full range of travel and make sure that:
-
the side-roller(s) (20) touch the track (2) at some point of its travel
-
the points that touch do not stop the smooth travel of the track (2).
(2)
To adjust the side-roller(s):
(a)
Remove the bolts (21), the washers (22), the side-roller(s) (20) and the shims (23).
(b)
Adjust the thickness of the shims (23):
-
to reduce the friction, increase the thickness of the shims
(23)
-
to make sure that the side-roller(s) (20) touch the track (2) at some point of its travel, decrease the thickness of the shims (23) as necessary.
(3)
Install the shims (23) and the side-rollers (20) with the washers
(22) and bolts (21).
(4)
Do the procedure again, as necessary, until the side-roller(s) (20) adjustment is correct.
(5)
For tracks 8 and 11, where applicable, safety the bolts (21) with MISCELLANEOUS (Material No. 19-010).
(6)
Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the bolts (21), the washers (22) and the shims (23).