-
the eccentric bush (27)
-
the bushes (17) and (23)
-
the bearings (8), (13) and (21).
Subtask 27-84-61-420-065
B. For the Slat tracks 1 and 2, Installation:
(1)
Install the bolt (31), the adjustment link (22), the links (4) and (10), the eccentric bush (27), the bolt (28), the washers (18) and
(19) and the nut (20). Tighten the nut (20) with your hand (this will be safetied when the Slat No. 1 is installed).
(2)
Install the bolt (32), the washer (15) and the nut (16). Tighten the nut (16) with your hand (this will be safetied when the Slat No. 1 is installed).
(3)
Install the bolt (9), the washer (6) and the nut (7). Tighten the nut
(7) with your hand (this will be safetied when the Slat No. 1 is installed).
NOTE : The bolts (1) and (33) and their related nuts and washers will
____ be correctly installed when the Slat No. 1 is installed.
Subtask 27-84-61-640-058
C. Application of Special Materials
(Ref. Fig. 602/TASK 27-84-61-991-008)
(1) For the Slat tracks 3 and 4, apply a layer of COMMON GREASE (Material No. 04-024) to:
-
the bolts (14) and (17)
-
the eccentric bush (13)
-
the bearing (5).
Subtask 27-84-61-420-066
D. For the Slat Tracks 3 and 4, Installation:
(1)
Put the bolt (17) in the link (18) and install the links (4) and (18).
(2)
Install the eccentric bush (13), the bolt (14), the washer (7) and the nut (8). Tighten the nut (8) with your hand (this will be safetied when the Slat No. 1 is installed).
NOTE : The bolts (1) and (20) and their related nuts and washers will
____ be correctly installed when the Slat No. 1 is installed.
(3) Install the applicable Slat track (Ref. TASK 27-84-61-400-004).
(4) Install the No. 1 Slat (Ref. TASK 27-84-63-400-002). Subtask 27-84-61-942-057
E. Removal of Equipment
(1)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(2)
Remove the safety barriers.
(3)
Remove the warning notice(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 27-84-61Page 623 1 1 Feb 01/01R 1 1 1CES 1
TASK 27-84-61-200-002 Check of Slat 1 Trailing Edge Backlash WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
No specific warning notice
No specific adjustable access platform 3.5 m (11 ft. 6 in.)
98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground
R **ON A/C 001-049, 051-061, 101-105, 201-203,
27-84-61-991-009 Fig. 603 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
27-84-61-991-009-A Fig. 603A
**ON A/C ALL
3. Job Set-up
__________
Subtask 27-84-61-941-054
A. Safety Precautions
(1) Put a warning notice in the cockpit to tell persons not to operate the slat controls.
(2) Put the safety barriers in position.
Subtask 27-84-61-860-053
B. Aircraft Maintenance Configuration WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵8(77)