 (3) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004): - for the left wing remove FIN 6010CM - for the right wing remove FIN 6060CM.
 (4) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT, installed outboard of the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000-003).

 

 (5)
 Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) to fully extend the slats.

 (6)
 Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT outboard of the removed torque shaft FIN 6101CM(6060CM) (Ref. TASK 27-50-00-400-003).

 (7)
 Remove the slat closing plate (Ref. TASK 27-84-69-000-001).


 4. Procedure
_________
 **ON A/C 001-049, 051-061, 101-105, 201-203,

 (Ref. Fig. 401/TASK 27-84-64-991-002) R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 27-84-64-991-002-A)
 **ON A/C ALL

 (Ref. Fig. 402/TASK 27-84-64-991-003)
 **ON A/C 001-049, 051-061, 101-105, 201-203,

 Subtask 27-84-64-020-051
 A. Removal of the No. 2 Slat
 (1)
 Disconnect the slat-to-track bonding strap at the No. 5 slat track:

 (a)
 Remove and discard the lockwire from the bolts (19).

 (b)
 Remove the nut (16) and the bonding strap (17) from the bolt (19), but do not remove the bolt. Install the nut (16) on the bolt (19).

 

 (2)
 Disconnect the slat-to-slat interfaces:
 (Ref. Fig. 403/TASK 27-84-64-991-001)


 (a)
 Remove the nut (4) and the bolt (6) then move the bonding strap

 (5)
 away from the bonding tag.

 

 


 Slat Attachment at the No. 5 Slat Track
 Figure 401/TASK 27-84-64-991-002

R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 27-84-64Page 406 1 1 May 01/05 1 1 1CES 1


 Slat Attachment at the No. 5 Slat Track Figure 401A/TASK 27-84-64-991-002-A
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-64Page 407 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


R  Slat Attachment at the No. 6 Slat Track Figure 402/TASK 27-84-64-991-003
 1EFF : 1 1 1CES  ALL  1 111 27-84-64 Page 408 Nov 01/03

 

R  Slat No. 2 - Location and General Configuration Figure 403/TASK 27-84-64-991-001 
R 1EFF : 1 1 1CES  ALL  1 111 27-84-64 Page 409 Nov 01/03

 

 (b)
 Remove the screws (1) and the stops (3).

 (c)
 Remove the weather seal (2).


 (3)
 Install the SLING-SLATS (Ref. TASK 27-80-00-400-001).

 (4)
 Lift the SLING-SLATS sufficiently, until it has the weight of the slat.

 (5)
 At the Nos. 5 and 6 slat tracks:

 (a)
 Remove and discard the cotter pins (23) from the nuts (32), (47),

 (55)
 and (56).

 (b)
 Loosen the nuts (32), (47), (55) and (56), but do not remove them.

 (c)
 Remove and discard the cotter pins (23) from the nuts (22), (24),

 (49)
 and (51).

 (d)
 Remove the items that follow:


 -
the nuts (22), (24), (49) and (51)

 -
the washers (21), (25), (48) and (50)

 -
the bolts (27), (30), (41) and (42)

 -
the bush (26).
 NOTE : The bush (26) is a part of the slat track and the slat

 

 

____
 track linkage assembly.

 (6) Lift the slat (30 kg (66.1386 lb)) from the slat tracks.
 (7) Move the slat with the hoist and lower it onto the support structure. R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 27-84-64-020-051-A
 A. Removal of the No. 2 Slat
 (1)
 Disconnect the slat-to-track bonding strap at the No. 5 slat track:

 (a) Remove the nut (16) and the bonding strap (17) from the bolt (19), but do not remove the bolt. Install the nut (16) on the bolt (19).

 (2)
 Disconnect the slat-to-slat interfaces:
 (Ref. Fig. 403/TASK 27-84-64-991-001)


 (a)
 Remove the nut (4) and the bolt (6) then move the bonding strap

 (5)
 away from the bonding tag.

 (b)
 Remove the screws (1) and the stops (3).

 (c)
 Remove the weather seal (2).

 

 (3)
 Install the SLING-SLATS (Ref. TASK 27-80-00-400-001).

 (4)
 Lift the SLING-SLATS sufficiently, until it has the weight of the slat.
 