• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  hydraulic motor which is attached to the valve block 26CV is 
R  almost the same. The differences in the procedures are given in 
R  the steps that follow. 
R  (1) Disconnect the case drain line (4) from the hydraulic motor (5). 
R  (2) Install the CAP - BLANKING on the open line ends (4). 
R  (3) Remove the bolts (3) and the washers (2). 
R  (4) Carefully remove the hydraulic motor (5) from the POB (9) and from 
R  the transfer tubes (8). 
R  (5) Remove and discard the O-ring (1). 
R  (6) Remove and discard the O-rings (7) and the back-up rings (6) from the 
R  transfer tubes (8).

 

R R  Hydraulic Motor Figure 402/TASK 27-84-54-991-002
 1EFF : 1 1 1CES  ALL  1 111 27-84-54 Page 419 Aug 01/04

 

 TASK 27-84-54-400-002
 Installation of the Hydraulic Motor of the Slat Power Control Unit (6001CM) without the Pressure-Off Brake and the Valve Block Assembly
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT)
 No specific 1 CONTAINER 5 L(1 1/2 USGAL)
 No specific 1 WARNING NOTICE

R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) 98D27504030001 2 LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003  F NSA 307110 TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00)

 Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 05-054 ZINC POWDER(USE WITH 05-002) (Ref. 20-31-00) Material No. 06-001A USA MIL-L-23398 SOLID FILM LUBRICANT AIR DRYING (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)

 

R C. Expendable Parts
R -------------------------------------------------------------------------------R FIG.ITEM |DESIGNATION |IPC-CSN R -------------------------------------------------------------------------------
R 1 O-ring 27-84-51 01 -070 R 6 back-up rings 27-84-51 01 -150 R 7 O-rings 27-84-51 01 -160
R D. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 12-12-29-611-001 R 12-12-29-611-002 R R 27-00-00-080-002 R R 27-00-00-480-002 R R 27-80-00-866-005 R 27-84-00-710-001 R 29-00-00-864-001 R R 29-10-00-863-001 R 29-10-00-863-003 R R 29-14-00-614-001 R 29-14-00-614-002 R R 32-12-00-410-001 R 27-84-54-991-002 Fill the Hydraulic Fluid Reservoir with a Hand Pump Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart Removal of the Flap/Slat Control-Lever Locking Tool (98D27803000000) Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) Retracting the Slats on the Ground Operational Test of the Slat System Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action Pressurize the Green Hydraulic System Pressurize the Blue Hydraulic System with a Ground Power Supply Depressurization of the Hydraulic Reservoirs Pressurization of the Hydraulic Reservoirs through the Ground Connector Close the Main Gear Doors after Access Fig. 402


R  3. Job Set-up__________ 
R  Subtask 27-84-54-860-055 
R  A. Aircraft Maintenance Configuration 
R  (1) Make sure that the slats are in the 0 degree position (Ref. TASK 27-
R  80-00-866-005). 
R  (2) Make sure that the LOCKING TOOL - FLAP/SLAT CONTROL LEVER 
R  (98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the 
R  slat/flap control lever. 
R  (3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the 
R  opening of the main door of the main gear. 
R  (4) Make sure that the Green and the Blue hydraulic systems are 
R  depressurized and put them in the maintenance configuration 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵8(57)