(2)
If applicable, on tracks 5 and 11 only, loosen the nut (56).
(3)
Remove the bolts (55) and the applicable front stop (54).
(4)
Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-019) to the shanks of the bolts (55).
(5)
Loosely assemble the applicable front stop (54) with the bolts (55).
(6)
For tracks 5 and 11, prepare the slat track (2) for electrical bonding (Ref. TASK 20-28-00-912-004).
(7)
Put and hold the track (2) in its fully retracted position.
(8)
Put the front stop (54) in position so that it is parallel with the bottom, forward, vertical-roller (15).
(9)
Tighten the bolts (55).
(10)
If applicable, on tracks 5 and 11 only, tighten the nut (56).
(11)
Safety the bolts (55) with MISCELLANEOUS (Material No. 19-010).
(12)
Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the bolts (55) and the nut (56).
(13)
For tracks 5 and 11, do the electrical bonding test (Ref. TASK 20-28-00-869-002).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 27-84-62Page 424 1301-399, 1May 01/05 1 1 1CES 1
Slat-Track End-Stop - Location and Detail
Figure 404/TASK 27-84-62-991-007
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 27-84-62Page 425 1 1 May 01/05 1 1 1CES 1R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
Subtask 27-84-62-820-055-A
H. Adjustment of the Front Stop (Tracks 6, 7, 8, 9, 10 and 12) R **ON A/C 062-099, 106-149, 151-199, 204-299, 401-499,
(Ref. Fig. 402/TASK 27-84-62-991-002)
**ON A/C 301-399,
(Ref. Fig. 402A/TASK 27-84-62-991-002-A) R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
(Ref. Fig. 404A/TASK 27-84-62-991-007-A)
(1)
Remove and discard the lockwire from the applicable bolts (55).
(2)
Remove the bolts (55) and the applicable front stop (54).
(3)
Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-019) to the shanks of the bolts (55).
(4)
Loosely assemble the applicable front stop (54) with the bolts (55).
(5)
For tracks 5 and 11, prepare the slat track (2) for electrical bonding (Ref. TASK 20-28-00-912-004).
(6)
Put and hold the track (2) in its fully retracted position.
(7)
Put the front stop (54) in position so that it is parallel with the bottom, forward, vertical-roller (15).
(8)
Tighten the bolts (55).
(9)
Safety the bolts (55) with MISCELLANEOUS (Material No. 19-010).
(10) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the bolts (55).
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-62Page 426 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Slat-Track End-Stop - Location and Detail Figure 404A/TASK 27-84-62-991-007-A
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-62Page 427 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C ALL
Subtask 27-84-62-220-143
J. Check of the clearance at the track(s) 5 and 9.
(Ref. Fig. 405/TASK 27-84-62-991-017)
(1) Do a check of the clearance at the track (5) and 9:
(a) Measure the DIM. X (between the slat track arm and the closing rib structure), this must be a minimum of 0.5 mm (0.0196 in.).
5. Close up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 402/TASK 27-84-62-991-002)
**ON A/C 301-399,
(Ref. Fig. 402A/TASK 27-84-62-991-002-A)
**ON A/C ALL
Subtask 27-84-62-640-050
A. Lubrication
(1) Lubricate the side-rollers (20) and the top and the bottom vertical-rollers (15) with COMMON GREASE (Material No. 04-024).
Subtask 27-84-62-410-050
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable actuators:
-
for track 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-400-001)
-
for tracks 7, 9 and 11 (Ref. TASK 27-84-49-400-002).
(3)
Install the applicable slat:
-
for tracks 5 and 6 (Ref. TASK 27-84-64-400-002)
-
for tracks 7 and 8 (Ref. TASK 27-84-65-400-002)
-
for tracks 9 and 10 (Ref. TASK 27-84-66-400-002)
-
for tracks 11 and 12 (Ref. TASK 27-84-67-400-002).