• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)
 Install the SLING-SLATS (98D27804009001) (Ref. TASK 27-80-00-400-001).

 (4)
 Loosen the screws (51) and (54) and push the seals (52) and (55) into the slat to the limit of their adjustment.


 NOTE : This will give a clearance between the seals (52) and (55) and
____ the wing structure during the slat rigging procedure.
 (5)
 Tighten the screws (51) and (54) with your hand.

 (6)
 At the No. 1, 2, 3 and 4 slat tracks remove:

 -
the nuts (14) and (40)

 -
the locking plates (13) and (38).

 

 


 Slat Rigging - Detail Figure 404/TASK 27-84-63-991-005 
R 1EFF : 1 1 1CES  ALL  1 111 27-84-63 Page 420 Nov 01/03

 

 Subtask 27-84-63-420-052
 B. Installation of the No. 1 Slat (Ref. Fig. 401/TASK 27-84-63-991-001, 402/TASK 27-84-63-991-002, 403/TASK 27-84-63-991-003)
 (1)
 Lift the slat into position.

 (2)
 At the No. 1, 2, 3 and 4 slat tracks:


 (a) Install the bush (34) and attach the slat to the slat tracks and the slat tracks links with:
 -
the bolts (16), (17), (39) and (41)

 -
the washers (3), (7), (30) and (33)

 -
the nuts (4), (6), (31) and (32).


 NOTE : If necessary, turn the eccentric bushes (10) and (36) to
____ help install the bolts (16), (17), (39) and (41).
 (b)
 TORQUE the nuts (4), (6), (18) and (20) to between 4.2 and 4.8 m.daN (30.97 and 35.39 lbf.ft).

 (c)
 TORQUE the nuts (31) and (32) to between 6.6 and 7.6 m.daN (48.67 and 56.04 lbf.ft).

 (d)
 Safety the nuts (4), (6), (18), (20), (31) and (32) with the new cotter pins (5). (Ref. Fig. 405/TASK 27-84-63-991-004)

 (e)
 Do not torque or safety the nuts (19) and (42).


 (3)
 Remove the SLING-SLATS (Ref. TASK 27-80-00-000-001).

 (4)
 You must adjust the upper trailing-edge of the slat to its maximum height, related to the fixed leading-edge. To adjust the height, turn the eccentric bushes (10) and (36) at the No. 1, 2, 3 and 4 slat tracks.


R
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 27-84-63Page 421 1 1 May 01/05 1 1 1CES 1


 Slat Rigging - Detail Figure 405/TASK 27-84-63-991-004 
R 1EFF : 1 1 1CES  ALL  1 111 27-84-63 Page 422 Nov 01/03

 

R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 27-84-63-420-051-A
 A. Preparation for Installation (Ref. Fig. 401/TASK 27-84-63-991-001, 402A/TASK 27-84-63-991-002-A, 403/TASK 27-84-63-991-003, 404/TASK 27-84-63-991-005)
 (1)
 Clean the component interface and/or the adjacent area with MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Install the SLING-SLATS (Ref. TASK 27-80-00-400-001).

 (4)
 Loosen the screws (51) and (54) and push the seals (52) and (55) into the slat to the limit of their adjustment.


 NOTE : This will give a clearance between the seals (52) and (55) and
____ the wing structure during the slat rigging procedure.
 (5)
 Tighten the screws (51) and (54) with your hand.

 (6)
 At the No. 1 slat track remove:

 -
the nut (14)

 -
the locking plate (13).

 

 (7)
 At the No. 2 slat track remove:

 -
the nut (13)

 -
the locking plate (12).

 

 (8)
 At the No. 3 and 4 slat tracks remove:


 -the nut (40)
 -the locking plate (38).
 Subtask 27-84-63-420-052-A

 B. Installation of the No. 1 Slat (Ref. Fig. 401/TASK 27-84-63-991-001, 402A/TASK 27-84-63-991-002-A, 403/TASK 27-84-63-991-003)
 (1) Lift the slat into position.
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-63Page 423 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 (2) At the No. 1 slat track:


 (a) Attach the slat to the slat tracks and the slat tracks links with:
 -
the bolts (16) and (17)

 -
the washers (3) and (7)

 -
the nuts (4) and (6).


 NOTE : If necessary, turn the eccentric bush (10) to help install
____
 the bolts (16) and (17).

 (b)
 TORQUE the nuts (4), (6), (18) and (20) to between 4.2 and 4.8 m.daN (30.97 and 35.39 lbf.ft).

 (c)
 Safety the nuts (4), (6), (18) and (20) with the new cotter pins (5). (Ref. Fig. 405/TASK 27-84-63-991-004)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵8(118)