R (2) For slat tracks 10 and 11:
R (a) Put the pinion assembly (23), together with the bearing (22), in
R position between the track ribs. Make sure that:
R - the pinion assembly (23) engages with the slat track
R - the greasers are aligned so that persons can get access to
R them.
R
R NOTE : It is recommended that a used pinion assembly (23) and____
R bearing (22) are installed in their initial position. A
R new pinion assembly (23) can be installed with the bearing
R (22) on the inboard or outboard side.
R
R (b) Install the end cover (26) with the bolts (24) and the washers
R (25). Tighten the bolts (24) with your hand.
R (c) Install the actuator housing (21) with the bolts (19) and the
R washers (20). Tighten the bolts (19) with your hand.
R (d) To align the pinion assembly (23) correctly, install the TOOL-
R ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12) on the flange of the
R actuator housing (21).
R (e) Tighten the bolts (19) and (24) in a diagonal sequence.
R (f) Remove the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12).
Subtask 27-84-68-420-053
R C. Continue with the Installation Procedure
R (1) For slat tracks 2, 3, 5, 6, 7, 8, 9 and 12:
(a) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) on
and around the bolts (1) and (7), and the related bushes and
nutplates.
(b) Lubricate the greasers on the pinion assembly (6) with COMMON
GREASE (Material No. 04-024).
R (c) For slat track 5, 6 and 8 only:
1 Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS_
(Material No. 09-019) to the shanks of the bolts (3).
2_ Install the bracket (4) and the bolts (3).
3_ Tighten the bolts (3).
4_ Safety the bolts (3) with MISCELLANEOUS (Material No. 19-010).
R 5_ Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the bolts (3).
R (2) For slat tracks 10 and 11:
(a) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) on and around the bolts (19) and (24), the washers (20) and (25) and the related nutplates.
(b) Lubricate the greasers on the pinion assembly (23) with COMMON GREASE (Material No. 04-024).
R (3) Remove the safety line from the applicable slats 1 and 2.
R (4) Remove the BEAM SUPPORT-SLATS 3, 4 AND 5 from the applicable slat.
R (5) Install the applicable actuator (Ref. TASK 27-84-48-400-001) or (Ref. TASK 27-84-49-400-002): - for track 2 pinion, install 6013CM (6063CM) - for track 3 pinion, install 6015CM (6065CM) - for track 5 pinion, install 6027CM (6077CM) - for track 6 pinion, install 6029CM (6079CM) - for track 7 pinion, install 6033CM (6083CM) - for track 8 pinion, install 6035CM (6085CM) - for track 9 pinion, install 6037CM (6087CM) - for track 10 pinion, install 6039CM (6089CM) - for track 11 pinion, install 6041CM (6091CM) - for track 12 pinion, install 6045CM (6095CM).
Subtask 27-84-68-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV.
Subtask 27-84-68-710-050
E. Test
(1) Do an operational test of the slat system (Ref. TASK 27-84-00-710-001).
5. Close-up
________ Subtask 27-84-68-942-050