Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 27-84-69-420-050
B. Installation of the Closing Plates
**ON A/C 001-049, 051-061, 101-105, 201-203,
(Ref. Fig. 403/TASK 27-84-69-991-002) R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
(Ref. Fig. 403A/TASK 27-84-69-991-002-A)
**ON A/C ALL
(1)
Install the closing plate (3) as follows:
(a)
Put the screws (4) through their related closing plate (3).
(b)
Put the spacers (2) on their related screws (4).
(c)
Put the closing plate (3) in position.
(d)
Hand tighten the screws (4) to the nut strips (1).
(e)
Use the pneumatic wrench and slowly retract the slats to the datum zero position.
(f)
Adjust the closing plate (3) with the screws (4) so that the DIM 'Z' is between 0.25 mm (0.01 in.) and 0.5 mm (0.02 in.).
(2)
Apply the paint as follows: WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
Closing Plates - Tolerances
Figure 403/TASK 27-84-69-991-002
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 27-84-69Page 414 1 1 May 01/05 1 1 1CES 1
INTENTIONALLY BLANK
1 1
27-84-69Page 415
1 1 Feb 01/01 1 1 1CES 1
Closing Plates - Tolerances
Figure 403A/TASK 27-84-69-991-002-A14 (SHEET 1)
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-69Page 416 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Closing Plates - Tolerances
Figure 403A/TASK 27-84-69-991-002-A24 (SHEET 2)
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-69Page 417 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Closing Plates - Tolerances
Figure 403A/TASK 27-84-69-991-002-A34 (SHEET 3)
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-69Page 418 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Closing Plates - Tolerances
Figure 403A/TASK 27-84-69-991-002-A44 (SHEET 4)
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-84-69Page 419 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(a)
Use the pneumatic wrench and extend the slats to the fully extended position.
(b)
Apply a layer of PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-003) that agrees with the external colour scheme to the slat track closing plate (3). Where the closing plate (3) makes an overlap with the leading edge surface, the structure paint must make an overlap of 18 mm
(0.71 in.).
(c) Let the paint dry, (approximately 24hrs at room temperature). NOTE : Let the structure paint dry before you retract the slats.
____ Subtask 27-84-69-860-051
C. Aircraft Maintenance Configuration
(1)
Use the pneumatic wrench and socket and put the slats in the '0' deg. position.
(2)
Remove the pneumatic wrench, or the wrench and socket, and the ADAPTOR-DRIVE, SLAT (AND FLAP) from the bevel gearbox.
Subtask 27-84-69-410-051
D. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable torque shaft (Ref. TASK 27-84-45-400-005):
-
for the left wing, install (FIN 6010CM)
-
for the right wing, install (FIN 6060CM).
5. Close-up
________ Subtask 27-84-69-866-054
A. Aircraft Maintenance Configuration