D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)-
27-50-00-000-002 Removal of the Inboard and Outboard Flap
Hoisting-Sling
27-50-00-400-002 Installation of the Inboard and Outboard Flap
Hoisting-Sling
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-50-00-866-012 Manual Retraction of the Flaps
27-51-00-820-001 Manual Adjustment of the Position Pick-Off Units
27-51-00-820-003 To Do a Check of the Flap Rigged Position (With the
Sharks Fin)
27-51-00-820-009 Adjustment of the Flap Rigged Position With the
Sharks Fin Tool (A321)
27-51-44-000-001 Removal of the Interconnecting Strut
27-51-44-400-001 Installation of the Interconnecting Strut
27-54-00-710-001 Operational Test of the Flap System
27-54-41-400-001 Installation of the Right Angle Gearbox
6203CM,(6253CM)
27-54-61-000-002 Removal of the Flap Kink-Seals
27-54-61-400-006 Installation of the Flap Kink-Seals
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-64-00-820-001 Adjustment of the Spoilers
54-55-00-000-001 Removal of the Aft Movable Fairing
54-55-00-400-001 Installation of the Aft Movable Fairing
57-51-37-000-002 Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
57-51-37-000-004 Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
57-51-37-400-002 Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
57-51-37-400-004 Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
57-55-11-010-001 To Lower the Flap Track No. 2 Movable Fairing for
Access
57-55-11-400-005 Installation of the Inboard and Outboard Flap Tab
Hinge-Fairings
1EFF : 301-399, 1 27-54-61Page A420 1 1 Aug 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
57-55-11-410-001 To Lift the Flap Track No. 2 Movable Fairing after
Access 27-54-61-991-016 Fig. 416 27-54-61-991-019 Fig. 417 27-54-61-991-017 Fig. 418 27-54-61-991-026 Fig. 419 27-54-61-991-030 Fig. 420 27-54-61-991-021 Fig. 421 27-54-61-991-018 Fig. 422 27-54-61-991-015 Fig. 423 27-54-61-991-020 Fig. 424 27-54-61-991-022-A Fig. 425 27-54-61-991-042 Fig. 426 27-54-61-991-040 Fig. 427 27-54-61-991-025 Fig. 428
3. Job Set-up
__________
Subtask 27-54-61-941-062
A. Safety Precautions
(1)
Make sure that the safety barriers are in position.
(2)
Make sure that the warning notice(s) are in position to tell persons not to operate the landing gear.
(3)
Make sure that the warning notice is in the cockpit to tell persons not to operate the flight controls.
Subtask 27-54-61-865-053
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21