R No specific circuit breaker(s) safety clip(s)
R No specific feeler gauge
R No specific warning notice
R No specific warning notices
R No specific access platform 1.6 m (5 ft. 3 in.)
R No specific access platform 3.5 m (11 ft. 6 in.)
R No specific Torque Wrench : range 0.20 to 3.60 m.daN
R (2.00 to 26.00 lbf.ft)
R No specific Torque Wrench : range 1.00 to 10.00 m.daN
R (8.00 to 75.00 lbf.ft)
R 98D27603000001 1 SPOILER POSITION CHECK TOOL
R 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
R 1EFF : 301-399, 1 27-64-00Page 523 1 1 May 01/04 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R 98D27903500000 2 PIN-SIDE STICK LOCKING
R B. Consumable Materials
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R No specific Lockwire corrosion resistant steel dia 0.8 mm (0.03 R in.)
R C. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-41-00-861-002 R R 24-41-00-862-002 R R 27-50-00-866-008 R 27-50-00-866-009 R 27-60-00-866-002 R 27-64-00-710-001 R 29-10-00-863-003 R R 29-10-00-864-003 R 29-23-00-863-001 R R R 29-23-00-864-001 R R 29-24-00-863-001 R R 29-24-00-864-001 R 27-64-00-991-001-A R 27-64-00-991-006 R 27-64-00-991-002 Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Extension of the Flaps on the Ground Retraction of the Flaps on the Ground Extension-Retraction of the Spoilers for Maintenance Operational Test of the Spoiler Hydraulic Actuation Pressurize the Blue Hydraulic System with a Ground Power Supply Depressurize the Blue Hydraulic System Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU Pressurize the Yellow Hydraulic System with the Electric Pump Depressurize the Yellow Hydraulic System Fig. 501A Fig. 502 Fig. 503
R 1EFF : 301-399, 1 27-64-00Page 524 1 1 May 01/04 1 1 1CES 1
R 3. Job Set-up__________
R Subtask 27-64-00-860-062
R A. Aircraft Maintenance Configuration
R (1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-
R 002).
R (2) Make sure that the flaps are in the fully retracted position
R (Ref. TASK 27-50-00-866-009).
R (3) On the center pedestal, make sure that the SPEED BRAKE control lever
R is set to RET.
R (4) Install the PIN-SIDE STICK LOCKING (98D27903500000) on each side
R stick controller.
R (5) Put the warning notices on the CAPT and F/O side sticks to tell
R persons not to touch the side sticks.
R (6) Install the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000)
R on the flap and slat control lever.
R (7) Put a warning notice on the center pedestal to tell persons not to
R operate the SPEED BRAKE control lever.
R Subtask 27-64-00-010-058
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵6(111)