R 1EFF : 301-399, 1 27-64-00Page 530 1 1 May 01/04 1 1 1CES 1
R (15) Pressurize the hydraulic system that relates to the spoiler you
R adjust.
R (a) For the spoiler 1 or 5, pressurize the Green hydraulic system
R (Ref. TASK 29-23-00-863-001).
R (b) For the spoiler 2 or 4, pressurize the Yellow hydraulic system
R (Ref. TASK 29-24-00-863-001).
R (c) For the spoiler 3, pressurize the Blue hydraulic system
R (Ref. TASK 29-10-00-863-003).
R (16) Make sure that the clearance X is correct.
R (17) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from each
R sidestick controller.
R (18) Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000)
R from the flap and slat control lever.
R Subtask 27-64-00-865-061
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 21CE1, 21CE2, 21CE3, 22CE
R Subtask 27-64-00-710-056
R D. Do the operational test of the spoiler hydraulic actuation (Ref. TASK 27-
R 64-00-710-001).
R 5. Close-up________
R Subtask 27-64-00-860-063
R A. Put the aircraft back to its initial configuration.
R (1) Depressurize the hydraulic system that relates to the spoiler you
R adjust:
R (a) For the spoiler 1 or 5, depressurize the Green hydraulic system
R (Ref. TASK 29-23-00-864-001).
R (b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
R (Ref. TASK 29-24-00-864-001).
R 1EFF : 301-399, 1 27-64-00Page 531 1 1 May 01/04 1 1 1CES 1
R (c) For the spoiler 3, depressurize the Blue hydraulic system
R (Ref. TASK 29-10-00-864-003).
R (2) Remove the warning notice(s).
R (3) Make sure that the work area is clean and clear of tool(s) and other
R items.
R Subtask 27-64-00-410-057
R B. Close Access
R (1) Install the protective cover on the battery power center 105VU.
R (2) Tighten the two screws.
R (3) Close the access door 822.
R (4) Close these access doors :
R (a) 573BB for the left spoiler 1.
R (b) 575BB for the left spoiler 2.
R (c) 575DB for the left spoiler 3.
R (d) 575EB for the left spoiler 4.
R (e) 575GB for the left spoiler 5.
R (f) 673BB for the right spoiler 1.
R (g) 675BB for the right spoiler 2.
R (h) 675DB for the right spoiler 3.
R (i) 675EB for the right spoiler 4.
R (j) 675GB for the right spoiler 5.
R (5) Remove the access platform(s).
R Subtask 27-64-00-862-059
R C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
R 002).
R 1EFF : 301-399, 1 27-64-00Page 532 1 1 May 01/04 1 1 1CES 1
R **ON A/C 151-199, 401-499,
TASK 27-64-00-820-001-B
Adjustment of the Spoilers
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______ OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job__________________
Self Explanatory