• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______
 FALL CAN INJURE OR KILL YOU.

 CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
 CARBONFIBER REINFORCED PLASTIC.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific crane
 No specific NSA9006-12B R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft) R SL90-626-3125 1 TOOL - INSTALLATION, WASHERS SL40871
 98D27309004000 1 PIN-ELEVATOR CENTERING
 98D27309006000 1 GAUGE-ELEVATOR NEUTRAL SETTING
 98D27903500000 4 PIN-SIDE STICK LOCKING
 98D55209004000 1 SLING-ELEVATOR

 

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004
Material No. 11-003 Material No. 11-008 Material No. 16-003
C. Expendable Parts
USA MIL-PRF-23827 TYPE I
 SYNTH.ESTER BASED GREASE HIGH PRESSURE
 (Ref. 20-31-00)
USA ASTM D 740
 METHYL-ETHYL-KETONE (Ref. 20-31-00)

 (USE 11-008A) (Ref. 20-31-00)
F ASNB70720
 COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)

 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
6  cotter pin 
R  6  cotter pins 
6  cotter pin 
R  6  cotter pins 
6  cotter pin 
R  6  cotter pins 
6  cotter pin 
6  cotter pin 
6  cotter pin 
R  6  cotter pins 
R  6  cotter pins 
9  cotter pin 
R  9  cotter pins 
9  cotter pin 
R  9  cotter pins 
9  cotter pin 
R  9  cotter pins 
9  cotter pin 
R  9  cotter pins 
9  cotter pin 
R  9  cotter pins 

27-34-07 21 -040 27-34-07 21 -04027-34-07 22 -010 27-34-07 22 -04027-34-07 24 -010 27-34-07 24 -04027-34-07 26 -01027-34-07 26A-01027-34-07 27 -010 27-34-07 27 -040 27-34-07 28 -04027-34-07 21 -060 27-34-07 21 -06027-34-07 22 -060 27-34-07 22 -06027-34-07 24 -060 27-34-07 24 -06027-34-07 27 -060 27-34-07 27 -06027-34-07 28 -060 27-34-07 28 -060 D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-22-00-400-001  Installation of STA-LOK Nuts and Lockwashers
 23-61-41-000-001  Removal of the Static Discharger
 23-61-41-400-001  Installation of the Static Discharger
 27-34-00-710-001  Operational Test of the Elevator and Hydraulic
 Actuation
 27-34-00-820-003  Adjustment of the Elevator and Hydraulic Actuation to
 0.5 Degrees Nose-Up with the Gauge-Elevator Neutral
 Setting (98D27309006000)
 27-34-51-400-001  Installation of the Elevator Servo Control
 27-92-13-400-001  Installation of the Elevator Servocontrol Position
 Transducer Unit 49CE1, 49CE2
 29-10-00-864-001  Depressurize the Green Hydraulic System
 29-10-00-864-002  Depressurize the Yellow Hydraulic System
 29-10-00-864-003  Depressurize the Blue Hydraulic System
 55-13-11-000-001  Removal of the THS Trailing Edge Access Panels
 55-13-11-400-001  Installation of the THS Trailing Edge Access Panels
 55-16-48-400-001  Installation of the Elevator Support Struts
 55-24-11-000-001  Removal of the Elevator Tips and Inboard End Caps.
 55-24-11-400-001  Installation of the Elevator Tips and End Caps.
 27-34-41-991-004  Fig. 401 


R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 27-34-41-991-001 Fig. 402
 **ON A/C 051-051,
 27-34-41-991-001-A Fig. 402A

 **ON A/C ALL
 27-34-41-991-003-A Fig. 403

 

 3. Job Set-up__________
 (Ref. Fig. 401/TASK 27-34-41-991-004)
 Subtask 27-34-41-860-052
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵3(51)