• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 - at the same time the reference marks
 on the input plate and the ball 
R  carrier of the control-valve detent 
R  must be in line. 
R  13. On the RH control-valve block 
R  (3) of the THS actuator (4):

 

 -------------------------------------------------------------------------------
ACTION RESULT
 -------------------------------------------------------------------------------R - remove the TOOL - JAMMING R SIMULATION from the splined R end of the control-valve R shaft.
 Subtask 27-44-00-710-052
R B. Do the test in the electrical mode of the LH valve block.
 CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______ TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE TO THE VALVE CONTROL SHAFT AND THE TOOL.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1.
 Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 29-23-00-863-001).

 2.
 Do the operational test of the jamming protection device again, in the configuration as follows:


 On the center pedestal: R - turn the pitch trim-control R wheel to the zero position.
 3. Depressurize the Green and Yellow hydraulic systems. (Ref. TASK 29-23-00-864-001).
R 4. On the LH control-valve block (2) R of the THS actuator (4):
R - install the TOOL - JAMMING R SIMULATION LH A/C N.UP R (OU190857) on the shaft (7) of R the LH control- valve block. R (Ref. Fig. 502/TASK 27-44-00-
991-003)The THS surface moves to the zero position.
On the THS actuator (4):
-the control-valve chain is in the jamming simulation configuration.


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
R  - push the TOOL - JAMMING 
R  SIMULATION on the splined end 
R  of the shaft (7) of the LH 
R  control-valve. 
R  - turn the mechanical input shaft 
R  (1) to turn the master spline, 
R  until the spigots of the tool 
R  engage with the slots of the 
R  valve block (2). 
R  - fully push the tool to insert 
R  the spigots in the slots. 
R  (Ref. Fig. 502/TASK 27-44-00-
991-003) 
R  5. On the THS actuator (4): 

R  - move the mechanical input shaft 
R  (1) in a Counter Clockwise 
R  (CCW) direction.
 6. Pressurize the Green and the 
Yellow hydraulic systems 
R  (Ref. TASK 29-23-00-863-001). 

R  CAUTION : STOP THE PITCH TRIM_______
 CONTROL WHEEL WITH YOUR
 HANDS IF THE
 THS-ACTUATOR DOES NOT
 STOP APPROXIMATELY 5
 SECONDS AFTER YOU HAVE
 PUSHED THE FLT CLT /
 ELAC 2 PUSH BUTTON
 SWITCH.
 THIS OPERATES THE
 JAMMING PROTECTION
 DEVICE WHICH PREVENTS
 DAMAGE TO THE STOP OF
 THE MECHANICAL INPUT
 SHAFT.
 7. On the center pedestal and on the 
panel 24VU: 

On the control-valves of the THS actuator:
-
the control-valves are in the open position.

On the center pedestal:

-
the pitch trim-control wheel moves to the aircraft nose UP direction (the THS leading edge moves down).


On the THS actuator (4) and on thepanel 24VU:


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
R  - look at the pointer of the 
R  pitch trim-control wheel. In 
R  the 5 degree nose UP position 
push the FLT CTL/ELAC 2 
pushbutton switch. 





R
 8. On the panel 24VU: 
- release the FLT CTL/ELAC 2 
switch. 
9. Depressurize the Green and Yellow
 hydraulic systems.
 (Ref. TASK 29-23-00-864-001).
 10. On the rudder pedals: 
R  - operate the rudder pedals in 
R  the left and right directions 
R  and wait 1 minute. 
R  11. On the THS actuator (4): 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵3(137)