-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-12-11-400-001 Installation of the Cockpit Floor Panels from FR1
thru FR12
53-12-12-400-001 Installation of the Cabin Floor Panels from FR12 thru
FR24
53-22-12-400-001 Installation of the Cabin Floor Panels
53-32-12-400-002 Installation of the Cabin Floor Panels
**ON A/C 001-049, 051-099, 101-149, 201-299,
27-41-44-991-002 Fig. 402 R **ON A/C 151-199, 401-499,
27-41-44-991-002-A Fig. 402A
**ON A/C 301-399,
27-41-44-991-002-B Fig. 402B
**ON A/C ALL
27-41-44-991-008 Fig. 403
27-41-44-991-003 Fig. 404
27-41-44-991-004 Fig. 405
27-41-44-991-005 Fig. 406
27-41-44-991-006 Fig. 407
27-41-44-991-007 Fig. 408
3. Job Set-up
__________ **ON A/C 001-003, 051-053,
Subtask 27-41-44-010-055
A. Get Access
(1)
Make sure that the access platform is in position at the zone 121.
(2)
Make sure that the access platform is in position at the zone 132.
(3)
Make sure that the access platform is in position at the zone 154.
(4)
Make sure that the access platform is in position at the zone 312.
(5)
Make sure that the access doors 811, 825, 826, 312AR are open.
(6)
In the zones 211 and 221, make sure that the floor panels 211GF, 211KF, 221AF, 221EF, 231CF are removed.
(7)
In the zone 241, make sure that the floor panels 231WF, 241BF, 241FF, 241KF are removed.
(8)
In the zone 131, make sure that the ceiling panels 131AC, 131BC, 131CC 131PW are removed.
(9)
In the zones 151 and 161, make sure that the ceiling panels 151AC, 151BC, 151CC, 151DC, 161AC, 161BC are removed.
R **ON A/C 151-199, 401-499,
Subtask 27-41-44-010-055-E
A. Get Access
(1)
Make sure that the access platform is in position at the zone 121.
(2)
Make sure that the access platform is in position at the zone 132.
(3)
Make sure that the access platform is in position at the zone 154.
(4)
Make sure that the access platform is in position at the zone 312.
(5)
Make sure that the access doors 811, 825, 826, 312AR are open.
(6)
In the zones 211, 221 and 231, make sure that the floor panels 211GF, 211KF, 221EF, 231CF 221LF are removed.
(7)
In the zones 231 and 241, make sure that the floor panels 231WF, 241BF, 241FF, 241KF are removed.
(8)
In the zone 131, make sure that the ceiling panels 131KC, 131MC, 131NC 131PW are removed.
(9)
In the zones 151 and 161, make sure that the ceiling panels 151EC, 151FC, 151GC, 161AC, 161BC are removed.
**ON A/C 301-399,
Subtask 27-41-44-010-055-D
A. Get Access
(1)
Make sure that the access platform is in position at the zone 121.
(2)
Make sure that the access platform is in position at the zone 132.
(3)
Make sure that the access platform is in position at the zone 154.
(4)
Make sure that the access platform is in position at the zone 312.