• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 C. Continue the Reset of the Torque Limiters
 (1) Push each applicable indicator (1) down so that it aligns with the torque limiter, in the usual system condition.
 Subtask 27-50-00-710-051
 D. Operational Test
 (1) Do the operational test of the flap system (Ref. TASK 27-54-00-710-001).
 5. Close-up
________ Subtask 27-50-00-860-059
 A. Aircraft Configuration
 (1)
 Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).

 (2)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 Subtask 27-50-00-865-064
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07
 49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/WTB/FLP/SYS2 12CV P20 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21 122VU FLIGHT CONTROLS/WTB/FLP/SYS1 10CV S07
 1EFF : ALL 1 27-50-00Page 236 1 1 Nov 01/02R 1 1 1CES 1


 Subtask 27-50-00-410-050
 C. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the applicable access panel(s):

 (a)
 For the LH wing, install the following panels:

 (b)
 For the RH wing, install the following panels: 1 For the flap track No.1 torque limiter:


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵3(199)