AIAA
Validity : S / N 1 - 9999 05 20 03 (JA) Page 206
JUN 01
ATA "2A" INSPECTION - 50 HOURS
FINAL STEPS AREA OTHER
INSPECTION PERFORMED
BY
FINAL STEPS 000
24-30 1) Connect the battery, lubricate the terminals - refer
to 24-30-02 201. 000
52-40 2) Install battery access door 243 (battery at the rear). 200
Check that it is correctly locked.
52-40 3) Install inspection door 211R (front battery option). 200
71-10 4) Install lower engine cowling 131 and upper engine
cowling 121 - refer to 71-10-01 201. 100
5) Check that all cowlings, access doors and fairings are correctly installed. 000
6) Perform a test run-up. Record the parameters (at engine shutdown) - refer to 05-30-02 201. 000
71-10 7) After the test run-up, remove upper engine cowling 121 and lower engine cowling 131, and check for leaks (oil, fuel, air, exhaust gases). 000
If everything is normal, reinstall the engine cowlings and
check that they are correctly locked - refer to
71-10-01 201.
8) Record this inspection in the aircraft maintenance files 000
(airframe and engine log books).
AIM
Validity : S / N 1 - 9999 05-20-03 (JA) Page 207
JUN 01
PAGE INTENTIONALLY LEFT BLANK
AIM
Validity : S / N 1 - 9999 05-20-03 (JA) Page 208
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 2(4)