• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-13 19:40来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

57-60 30) Check the R.H. aileron balancing weight attach fittings for condition. 600  
57-60 31) Visually inspect the R.H. aileron hinge fittings, check the ball joints, the attach fittings and the stops. 600  
57-60 32) Visually inspect the visible portions of the R.H. aileron ; in case of doubt, remove the aileron and inspect for loose rivets, cracks, distortion and evidence of corrosion - refer to 57-60-00 201. 600  
57-60 33) Check the R.H. aileron for freedom of rotation - refer to 27-10-00 201. 600  
57-50 34) Visually inspect the visible portions of the R.H. flap ; in case of doubt, remove the flap and inspect for loose rivets, cracks, distortion and evidence of corrosion - refer to 57-50-00 201. 600  
57-50 35) Visually inspect the R.H. flap hinge fittings, check the ball joints and the attach fittings. 600  
20-00 36) Reinforce the anticorrosion protection - refer to 600  
 20-00-04 201 and lubricate - refer to 12-21-04 201.   
52-40 37) Install sealed inspection doors 613, 614 - refer
to 52-40-00 201. 600  
57-30 38) Install wing tip 617 (if not riveted) - refer to 57-30-00 201. 600  
12-10 39) Fill the fuel tanks and inspect for leaks - refer to 000  
 12-11-01 301, 28-10-00 601.   
 NOTE : Before and during refueling, perform
operational tests of fuel gages - refer to   
 28-40-01 401 and low fuel level detectors (if installed) - refer to 28-40-04 201.   

AIAA
Validity : S / N 1 - 9999 05-20-05 (JA) Page 224
JUN 01
 

ATA "80A" MAJOR INSPECTION
ENGINE COMPARTMENT INSPECTION (AREA 100) AREA OTHER
INSPECTION PERFORMED
BY
71-00 ENGINE COMPARTMENT INSPECTION (AREA 100) 100  
71-00 1) Perform an overall visual inspection of area 100. 100  
11-00 2) Check installation and legibility of exterior placards and markings - refer to 11-20-00 1. 100  
32-40 3) Visually inspect the brake hydraulic reservoir. Check fluid level - refer to 12-13-01 301. 100  
32-40 4) Change the brake hydraulic fluid - refer to 12-13-01 301, 12-13-02 301. 100 3 years 
71-20 5) Thoroughly inspect the whole engine mount ; in case of doubt, perform a fluorescent penetrant inspection - refer to 20-00-14 301 and 71-20-00 201. 100  
 Systematically perform a fluorescent penetrant
inspection in case of engine removal.   
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 2(39)