AIAA
Validity : S / N 1 - 9999 05-20-03 (JA) Page 202
JUN 01
ATA "2A" INSPECTION - 50 HOURS
COCKPIT AND FUSELAGE INSPECTION (AREA 200) AREA OTHER INSPECTION
PERFORMED
BY
53-00 COCKPIT AND FUSELAGE INSPECTION (AREA 200) 200
30-10 1) Check the de-icing system (if installed) - refer to 200
30-09-90 301.
20-00 2) Reinforce the anticorrosion protection - refer
to 20-00-04 201 and lubricate - refer to 12-21-02 201. 200
AIM
Validity : S / N 1 - 9999 05-20-03 (,A) Page 203
JUN 01
ATA "2A" INSPECTION - 50 HOURS
LANDING GEAR INSPECTION (AREA 700) AREA OTHER
INSPECTION PERFORMED
BY
32-00 LANDING GEAR INSPECTION (AREA 700) 700
32-40 1) Visually inspect the tires ; look for evidence of uneven wear, cuts, distortion and displacement of the tire on the wheel. 700
32-40 2) Visually inspect the braking systems for condition,
attachment, brake plate and disk wear. 700
32-40 3) Check tire inflation pressures - refer to 12-14-01 301. 700
AIAA
Validity : S / N 1 - 9999 05 20-03 (JA) Page 204
JUN 01
ATA "2A" INSPECTION - 50 HOURS
ENGINE COMPARTMENT INSPECTION (AREA 100) AREA OTHER INSPECTION
PERFORMED
BY
71-00 ENGINE COMPARTMENT INSPECTION (AREA 100) 100
71-00 1) Perform an overall visual inspection of area 100. 100
32-40 2) Visually inspect the brake hydraulic reservoir. Check fluid level - refer to 12-13-01 301. 100
24-30 3) Check the condition and tension of the alternator belt - refer to 24-30-01 201. 100
Check the tension of a new belt after the first 25 operating hours.
Refer to the latest issue of LYCOMING Service
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 2(2)