曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
INSPECTION PERFORMED
BY
30-60 29) Visually inspect the supply lines of the propeller de-icing system (if installed) for routing, and condition of attach fittings - refer to 30-60-00 201. 000
61-10 30) Install propeller spinner 111, make sure that washers are installed under the screw heads - refer to 61-10-00 401. 100
61-10 31) Visually inspect the propeller governor. 100
37-00 32) Replace the vacuum system filter (SIGMATEK pump, if installed). 100 500 hrs
37-00 33) Replace the (mechanical) AIRBORNE vacuum pump drive (if installed). 100 Recommen ded 6 years
37-00 34) Visually inspect the vacuum system vacuum pump, the unions, fittings and pipes (if installed). Check the drive for oil leaks. 100
74-10 35) Perform an overhaul of the TCM magneto. 100 Associated
with engine
overhaul or
4 years
74-10 36) Check the TCM magneto, the attach fittings and the grounding. Refer to the latest issue of LYCOMING 100 100 hrs or
1 year
Service Bulletin No. 515 (SB 643 Teledyne Continental, Paragraphs 1 and 2B).
74-10 37) Check the TCM magneto, the attach fittings and the grounding. Refer to the latest issue of LYCOMING 100 500 hrs
Service Bulletin No. 515 (SB 643 Teledyne Continental, Paragraphs 2A and 3).
74-10 38) Check breaker points for pitting and minimum gap. 100
74-10 39) Check for excessive oil in the breaker compartment ; if found, wipe dry with a clean lint-free cloth. 100
74-10 40) The felt located at the breaker points should be lubricated in accordance with the magneto manufacturer's
instructions. 100
74-10 41) Check magneto to engine timing. 100
74-20 42) Remove and thoroughly inspect the upper and lower spark plugs. If the spark plugs are fouled, clean and adjust gap, then permute upper and lower spark plugs -refer to 74-20-02 201. 100
74-20 43) Check the conductors and the ceramics for corrosion and deposits. 100
Clean the cable ends, spark plug walls and ceramics with a dry clean cloth or a clean cloth moistened with methyl-ethyl-ketone. Dry.
AIAA
Validity : S / N 1 - 9999 05-20-04 (JA) Page 214
JUN 01
ATA "4A" INSPECTION - 100 HOURS
ENGINE COMPARTMENT INSPECTION (AREA 100) AREA OTHER INSPECTION
PERFORMED
BY
74-20 44) Check ignition harness clamps for security and spark plug and magneto terminals for tight connection. 100
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 2(15)