AIAA
Validity : S / N 1 - 9999 05-20-04 (JA) Page 212
JUN 01
ATA "4A" INSPECTION - 100 HOURS
ENGINE COMPARTMENT INSPECTION (AREA 100) AREA OTHER
INSPECTION PERFORMED
BY
73-10 S / N 1 - 9999 100
14) Visually inspect the mechanical fuel pump. Check attach fittings and connections on the engine pump and the pressure switch.
73-20 15) Perform an overhaul of the injection pump. 100 Associated
with engine
overhaul
73-20 16) Remove and clean the injection pump fuel supply filter. 100
Install the filter - refer to 73-20-01 301.
73-10 17) Visually inspect the flow distributor. 100
73-10 18) Check the fuel injector nozzles for looseness - refer to 73-10-02 201. 100
73-10 19) Check for discoloration at the fuel injector nozzles 100
(evidence of leak) and check the lines for attachment
refer to 73-10-02 201 and the latest issue of LYCOMING
Service Bulletin No. 342.
73-00 20) Check the fuel system for leaks and security of the clamps. 100
28-00 21) Inspect the fuel system for tightness (from the electric pump to the power plant equipment) - refer to 000
28-00-00 201.
61-10 22) Remove and thoroughly inspect propeller spinner 111 for cracks, check the attach fittings - refer to 61-10-00 401. 100
61-10 23) Perform an overhaul of the propeller. 100 Refer to
05-10-00
61-10 24) Perform an overhaul of the propeller governor. 100 Associated
with engine
overhaul
61-10 25) Check the grooved rubber on the de-iced propeller (if installed) for bonding and cleanliness - refer to 100
30-60-00 201.
61-10 26) Visually inspect the propeller and the bulkhead(s) for impact marks and evidence of corrosion. Make sure that the strip is present on the bulkhead(s) (if installed). 100
30-60 27) Check the fluid level of the propeller de-icing system (if installed) - refer to 30-60-00 201. 100
30-60 28) Visually inspect the propeller de-icing system components 100
(if installed) : tank, flange - refer to 30-60-00 201.
AIAA
Validity : S / N 1 - 9999 05 20-04 (JA) Page 213
JUN 01
ATA "4A" INSPECTION - 100 HOURS
ENGINE COMPARTMENT INSPECTION (AREA 100) AREA OTHER
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 2(14)