__ terminals A1, B1 and C1 trouble shoot the AC supply (Ref. TSM 24 PB 101).
 11 If, with the C/B-2QA closed, the 115VAC supply is not
__ available at the terminals A2, B2 and C2, replace the C/B-FUEL/R WING TK/PUMP 1 SPLY (2QA).
 12 Raise the front face of the C/B panel 121VU to the closed
__ (vertical) position and secure.
 13 In the forward avionics bay remove the front cover of the
__ contactor box 107VU (Ref. AWM 93-01-07).
 14 Do a visual inspection as specified in step (j)2_ and replace,
__ if necessary:
 a The CNTOR-R WING TK PUMP 1 SPLY (18QA).
_
 b The connector 1260VC-A and related receptacle.

_

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-21-00∞∞∞∞∞∞∞∞∞∞Page 247
 201-299, 401-499, Aug 01/05 CES

 

 15__ Remove the contactor 18QA.
 16__ Use a multimeter and make sure that each of the 115VAC three phases are available at the contactor base input sockets (8, 6 and 2) (Ref. ASM 28-21/01).
 17__ If the 115VAC supply to the contactor 18QA is not available, do a test of the aircraft wiring (three phase supply) between the C/B-FUEL/R WING TK/PUMP 1 SPLY (2QA) and the CNTOR-R WING TK PUMP 1 SPLY (18QA) (Ref. ASM 28-21/01). Do the test as follows:
 a_ Continuity test, with a multimeter, of each three phase wire (from end to end) (Ref. ESPM 20-52-21).
 b_ Insulation test, with a 500VDC insulation tester, between each phase wire (pole) and ground (Ref. ESPM 20-52-24).
 c_ Insulation test, with a 500VDC insulation tester, between each phase wire and the other two wires (pole to pole) (Ref. ESPM 20-52-24).
 d_ Repair/replace the unserviceable wiring and connectors.
 e_ Install the contactor 18QA.
 f_ Install the the front cover of the contactor box 107VU.
 18__ If the 115VAC supply is available, install the contactor 18QA.
 19__ Set the R TK PUMPS 1 P/BSW (14QA) to ON (push in). This will energize the contactor 18QA and the 115VAC three phases will be supplied to the contactor 18QA output terminals, 7, 5 and 1.
 20__ Use a multimeter to do a test, to make sure that each of the 115VAC three phases are available at the terminal block 1176VT, terminals 9F, 11A and 11E (Ref. AWM 28-21-02).
 21__ Set the R TK PUMPS 1 P/BSW (14QA) to OFF (released out). This will de-energize the contactor 18QA.
 22__ If the 115VAC is not available at the terminal block, replace the CNTOR-R WING TK PUMP 1 SPLY (18QA).
 a_ Install the front cover of the contactor box 107VU.
 23__ If the 115VAC is available at the terminal block, do a test of the aircraft wiring (three phase supply) between the CNTOR-R WING TK PUMP 1 SPLY (18QA) and the PUMP-FUEL No. 1, R WING TK (22QA) free connector 22QA-A (Ref. ASM 28-21/01).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-21-00∞∞∞∞∞∞∞∞∞∞Page 248
 201-299, 401-499, Aug 01/05 CES

 

 NOTE : If necessary, you can divide the supply cable between
____ the contactor 18QA and the connector 22QA-A into two sections at the connector 7100VC (Ref. AWM 28-21-02).
 Do the test as follows:
 a Continuity test, with a multimeter, of each three phase
_ wire (from end to end) (Ref. ESPM 20-52-21).
 b Insulation test, with a 500VDC insulation tester, between
_ each phase wire (pole) and ground (Ref. ESPM 20-52-24).
 c Insulation test, with a 500VDC insulation tester, between
_ each phase wire and the other two wires (pole to pole) (Ref. ESPM 20-52-24).
 d If during the wiring test in step 23_ the wiring is
_ unserviceable, repair/replace the unserviceable wiring and connectors.
 e If the fuel pump supply cable is found to be unserviceable
_ (where it is routed across the lower surface of the wing) repair as follows:
 CAUTION : DO NOT USE IN-LINE SPLICES TO REPAIR SECTIONS OF
_______ ELECTRICAL CABLE THAT ARE BEHIND A FAIRING OR IN A CONDUIT. THIS WILL MAKE SURE THAT IT IS POSSIBLE TO SEE THE REPAIR FOR AN INSPECTION (REF. ESPM 20-53-29).
 f If necessary, replace the unserviceable:
_

 - protective sleeve

 - wire(s)

 - connector 22QA-A.


 g Connect the new wire(s) of the fuel pump supply cable where
_ the wiring passes through the junction box (bracket assembly), by a splice(s) (Ref. ESPM 20-53-21).
 h Make sure that the length of the new supply cable when
_ assembled, between the front face of the connector 22QA-A and the forward face of the cable guide (that shows outside the wing-skin) is 1320 mm (51.9685 in.).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 FUEL 燃油1(87)