3. Fault Confirmation
__________________
A. Test Do the operational test of the BCL2 (Ref. AMM TASK 24-38-00-710-001).
4. Fault Isolation
_______________
A. If the test gives the maintenance message BCL2 : LGCIU/ADIRU1 SIGNAL DISAGREE:
NOTE : This CFDS message can be found with these CFDS messages:
____
. LGCIU1 or
. ADIRU1 and
BCL1 : LGCIU/ADIRU1 SIGNAL DISAGREE.
In this case, do the related trouble shooting.
If not, do the trouble shooting given below:
- do a check of the wiring for open circuit or short to ground: . from the pin A/g of the BCL2 to the first branch point. . between the pin A/K of the BCL2 and the pin B/4C of the LGCIU1 (Ref. ASM 24-24/02) and (Ref. ASM 24-38/01).
(1) If the wiring is not correct:
- repair it.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-38-00∞∞∞∞∞∞∞∞∞∞Page 227
May 01/00R CES
(2) If the wiring is correct:
- replace the BCL-2 (1PB2) (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
B. Do the test given in Para. 3.A.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-38-00∞∞∞∞∞∞∞∞∞∞Page 228
May 01/00R
CES TASK 24-38-00-810-824
Failure of the Supply from the 28VDC HOT BUS (701PP)
1. Possible Causes
_______________
- BCL-1 (1PB1)
- wiring
- P/BSW-ELEC/BAT1 (7PB1)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) AMM 24-38-34-000-001 Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) AMM 24-38-34-400-001 Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2) ASM 24-38/01
3. Fault Confirmation
__________________
A. Test Do the operational test of the BCL (Ref. AMM TASK 24-38-00-710-001).
4. Fault Isolation
_______________
A. If the test gives the maintenance message CHECK HOT BUS 701PP/BCL1 CIRCUIT:
- do a check of the wiring for open circuit between the BAT REF/BCL1 circuit breaker (9PB1) and the pin A/C of the BCL1 (Ref. ASM 24-38/01).
(1) If the wiring is not correct:
- repair it.
(2) If the wiring is correct:
- replace the P/BSW-ELEC/BAT1 (7PB1).
(3) If the fault continues:
- replace the BCL-1 (1PB1) (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-38-00∞∞∞∞∞∞∞∞∞∞Page 229
May 01/00R CES
TASK 24-38-00-810-825
Failure of the Supply from the HOT BUS (702PP)
1. Possible Causes
_______________
- BCL-2 (1PB2)
- wiring
- P/BSW-ELEC/BAT2 (7PB2)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) AMM 24-38-34-000-001 Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) AMM 24-38-34-400-001 Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2) ASM 24-38/02
3. Fault Confirmation
__________________
A. Test Do the operational test of the BCL2 (Ref. AMM TASK 24-38-00-710-001).
4. Fault Isolation
_______________
A. If the test gives the maintenance message CHECK HOT BUS 702PP/BCL2 CIRCUIT:
- do a check of the wiring for open circuit between the circuit breaker BAT REF/BCL2 (9PB2) and the pin A/C of the BCL2 (Ref. ASM 24-38/02).
(1) If the wiring is not correct:
- repair it.
(2) If the wiring is correct:
- replace the P/BSW-ELEC/BAT2 (7PB2). 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3(61)