 A. Test Do the operational test of the BCL 1 (Ref. AMM TASK 24-38-00-710-001).
 4. Fault Isolation
_______________
 A. If the test gives the maintenance message BATTERY 1:
 - replace the BAT-1 (2PB1), (Ref. AMM TASK 24-38-51-000-001) and (Ref. AMM TASK 24-38-51-400-001).
 (1) If the fault continues:
 - replace the BCL-1 (1PB1), (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
 B. Do the test given in Para. 3.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-38-00∞∞∞∞∞∞∞∞∞∞Page 201
 Feb 01/98 CES

 TASK 24-38-00-810-802


 Failure of the Battery 2
 1. Possible Causes
_______________
 - BAT-2 (2PB2)

 - BCL-2 (1PB2)


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) AMM 24-38-34-000-001 Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) AMM 24-38-34-400-001 Installation of the Battery Charge Limiter (BCL)
 (1PB1, 1PB2) AMM 24-38-51-000-001 Removal of the Batteries (2PB1, 2PB2) AMM 24-38-51-400-001 Installation of the Batteries (2PB1, 2PB2)
 3. Fault Confirmation
__________________
 A. Test Do the operational test of the BCL 2 (Ref. AMM TASK 24-38-00-710-001).
 4. Fault Isolation
_______________
 A. If the test gives the maintenance message BATTERY 2:
 - replace the BAT-2 (2PB2), (Ref. AMM TASK 24-38-51-000-001) and (Ref. AMM TASK 24-38-51-400-001).
 (1) If the fault continues:
 - replace the BCL-2 (1PB2), (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
 B. Do the test given in Para. 3.

 TASK 24-38-00-810-803


 Internal Failure of the BCL 1
 1. Possible Causes
_______________
 - BCL-1 (1PB1)
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) AMM 24-38-34-000-001 Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) AMM 24-38-34-400-001 Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2)
 3. Fault Confirmation
__________________
 A. Test Do the operational test of the BCL 1 (Ref. AMM TASK 24-38-00-710-001).
 4. Fault Isolation
_______________
 A. If the test gives the maintenance message BCL 1, or if you cannot start the test:
 - replace the BCL-1 (1PB1), (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
 B. Do the test given in Para. 3.

 TASK 24-38-00-810-804


 Failure of the Current Acquisition Circuit of the BCL 1
 1. Possible Causes
_______________
 - SHUNT-BAT 1 (3PB1)

 - BCL-1 (1PB1)

 - wiring from the battery 1 shunt to the pins A/L, A/M and A/N of the BCL 1


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
AMM 24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) AMM 24-38-34-000-001 Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) AMM 24-38-34-400-001 Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2) ASM 24-38/01
 3. Fault Confirmation
__________________
 A. Test Do the operational test of the BCL 1 (Ref. AMM TASK 24-38-00-710-001).
 4. Fault Isolation
_______________
 A. If the test gives the maintenance message SHUNT 3PB1/BCL1 CIRCUIT:
 - replace the SHUNT-BAT 1 (3PB1).
 (1) If the fault continues:
 - replace the BCL-1 (1PB1) (Ref. AMM TASK 24-38-34-000-001) and (Ref. AMM TASK 24-38-34-400-001).
 (a) If the fault continues:
 - do a check and repair the wiring from the battery 1 shunt to the pins A/L, A/M and A/N of the BCL 1 (Ref. ASM 24-38/01).
 B. Do the test given in Para. 3.
 