REPORT/TEST/ELEC Page
AMM 31-60-00-860-001 EIS Start Procedure
AMM 31-60-00-860-002 EIS Stop Procedure
ASM 24-32/01
ASM 24-42/01
3. Fault Confirmation
__________________
A. Job Set-up
(1) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-30-00∞∞∞∞∞∞∞∞∞∞Page 205
Feb 01/98 CES
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(c) On the MCDU, get the ELEC menu on the SYSTEM REPORT/TEST page (Ref. AMM TASK 31-32-00-860-004).
B. Test
NOTE : Before you do the test of the TR2, make sure that the AC BUS 2
____
supplies its primary winding, in any RESET mode.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel: - push the ELEC key. On the upper ECAM DU:- the TR2 FAULT message comes into view.
On the lower ECAM DU, on the ELEC page: - the line connection between the TR2
and the DC2 busbar is not shown, - the DC BAT busbar energizes the DC2 busbar, - the TR2 indication is shown in amber, the value is 0 A and is shown in
amber.
2. On the MCDU: - push the line key adjacent to the TR2 indication, The TR2 page comes into view.
- push the line key adjacent to the RESET indication. If on the TR2 page:- the NO FAULT indication comes into
NOTE : If the CFDS is not____ available, you can reset with the TR RESET pushbutton switch (15PU) which is on the relay box 103VU. view, andOn the lower ECAM DU, on the ELECpage:- the TR2 supplies the DC2 busbar.Stop the trouble shooting.
If on the TR2 page: - the TR2 indication comes into view.
On the ELEC page: - the line connection between the TR2
and the DC2 busbar is not shown, - the DC2 busbar is not shown.
Continue the trouble shooting (Refer to the fault isolation which follows).
4. Fault Isolation
_______________
R **ON A/C 001-049, 051-062, 101-105, 151-152, 201-205,
A. If the test confirms the fault:
- do a check of the status of the circuit breakers 4PU2 and 2PU2.
(1) If the circuit breakers are closed:
- do a check of the TR2 voltage on the lower ECAM DU, on the ELEC page.
(a) If the TR2 voltage value is approximately 28VDC:
- replace the CNTOR-TR 2 (5PU2) (Ref. AMM TASK 24-32-55-000-001) and (Ref. AMM TASK 24-32-55-400-001).
1 If the fault continues:
_
- do a check and repair the wiring between the TR2 28VDC outlet and the TR2 pin B/F (Ref. ASM 24-32/01).
2 If the fault continues:
_
- replace the CNTOR-TR 2/AC SVCE BUS NORM SPLY (14PU) (Ref. AMM TASK 24-32-55-000-001) and (Ref. AMM TASK 24-32-55-400-001).
(b) If the TR2 voltage value is 0VDC and shown in amber:
- do a check for 115VAC on the pins M, L,K of the contactor (14PU).
1 If there is 115VAC:
_
- replace the TR-2 (1PU2) (Ref. AMM TASK 24-32-51-000-001) and (Ref. AMM TASK 24-32-51-400-001).
2 If there is no 115VAC:
_
- do a check for 115VAC on the pins D, E, F of the contactor (14PU).
a If there is 115VAC:
_
- replace the RELAY GND/FLT SELECT CTL(7XX).
. If the fault continues:
- replace the CNTOR-TR 2/AC SVCE BUS NORM SPLY (14PU) (Ref. AMM TASK 24-32-55-000-001) and (Ref. AMM TASK 24-32-55-400-001).
. If the fault continues:
- replace the CNTOR-AC & DC GND SVCE SPLY (14XX) (Ref. AMM TASK 24-42-55-000-001) and (Ref. AMM TASK 24-42-55-400-001).
- do a check and repair the wiring between:
. If the fault continues:
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-30-00∞∞∞∞∞∞∞∞∞∞Page 207
May 01/05 CES
. the ELEC/AC PWR/SVCE/CTL circuit breaker (3XX) and the
pin 3 of the contactor (14PU)
. the pin 5 of the contactor (14PU) and the ground.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3(38)