_
- replace the C/B-SVCE 601PP/602PP SPLY (1PX).
R **ON A/C 063-099, 106-149, 153-199, 206-299, 301-399, 401-499,
A. If the test confirms the fault:
- do a check of the status of the circuit breaker (1PX).
(1) If the circuit breaker is closed:
- do a check for 28VDC on the pin 6 of the module 14PN (Ref. ASM 24-43/01).
(a) If there is no 28VDC:
- do a check of the wiring between the circuit breaker (1PX) and the DC SVCE BUS ground supply contactor (Ref. ASM 24-43/01).
1 If there is no continuity:
_ - repair the wiring.
2 If there is continuity:
_
- replace the C/B-SVCE 601PP/602PP SPLY (1PX).
(b) If there is 28VDC:
- do a check for 28VDC on the pin 3 of the DC SVCE BUS ground supply contactor (Ref. ASM 24-43/01).
1 If there is no 28VDC:
_
- do a check of the wiring between the pin 6 of the module 14PN and the pin 5 of the contactor (Ref. ASM 24-43/01).
a If there is no continuity:
_ - repair the wiring.
b If there is continuity:
_
- replace the C/B-ELEC/DC SVCE/BUS/ON TR2 (5PX) or the CNTOR-DC SVCE BUS GND SPLY (3PX) (Ref. AMM TASK 24-43-55-000-001) and (Ref. AMM TASK 24-43-55-400-001).
2 If there is 28VDC:
_
- replace the CNTOR-DC SVCE BUS GND SPLY (3PX) (Ref. AMM TASK 24-43-55-000-001) and (Ref. AMM TASK 24-43-55-400-001).
(2) If the circuit breaker is open:
- close it.
(a) If the circuit breaker trips:
- do a check for short to ground of the wiring between the circuit breaker (1PX) and the busbars (601PP) and (602PP) (Ref. ASM 24-43/01).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-43-00∞∞∞∞∞∞∞∞∞∞Page 203
Aug 01/05 CES
R R 1_ If there is a short to ground:- repair the wiring.
R R 2_ If there is no short to ground:- replace the C/B-SVCE 601PP/602PP SPLY (1PX).
R **ON A/C ALL
B. Do this test to make sure that the system operates correctly.
(1) Do the test given in Para. 3. and make sure that the CAPT dome lights come on.
5. Close-up________
A. Put the aircraft back to its initial configuration.
(1) On the overhead panel 25VU, put the INT LT/DOME switch in the OFF position.
(2) De-energize the ground service network with the ground power unit (Ref. AMM TASK 24-42-00-862-001).
AC ELECTRICAL LOAD DISTRIBUTION - FAULT ISOLATION PROCEDURES
____________________________________________________________
TASK 24-50-00-810-801
Unwanted Warning from the AC Essential Sheddable Busbar
1. Possible Causes
_______________
- RELAY-BUS 801XP CTL (7XH)
- C/B - ELEC/AC BUS/8XP/MONG (6XH)
- wiring
- wiring between the pin B of the relay (7XH) and the pin D/5D of the SDAC1 and 2
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power AMM 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
AMM 31-60-00-860-001 EIS Start Procedure
ASM 24-52/01
3. Fault Confirmation
__________________
A. Job Set-up
(1) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AUTO FLT/MCDU/1 11CA1 B01 49VU LIGHTING/XFMR/115V.5V/ESS BUS 29LP H03 122VU LIGHTING/TST/BOARD/SPLY 30LP X06
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞24-50-00∞∞∞∞∞∞∞∞∞∞Page 201
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3(119)