• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 17:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_________
 Subtask 78-30-00-710-052-A
 A. Bleed the air from the thrust reverser hydraulic system as follows:
 WARNING : DO NOT OPEN THE HCU BLEED VALVE WHEN THE HYDRAULIC CIRCUIT IS
_______ PRESSURIZED. REMOVAL OF THE CAP WHEN THE HYDRAULIC CIRCUIT IS PRESSURIZED CAN RESULT IN INJURY TO PERSONS.
 (1) Operate the thrust reverser for 10 deploy-to-stow cycles (Ref. TASK 78-31-00-710-042). Make sure that the thrust reverser doors operate smoothly.

 (2) If the thrust reverser doors operate smoothly, it is mot necessary to do the steps that follow.

 (3) If the doors shake during opening or closing, do this HCU bleeding procedure:


 (a) Depressurize the hydraulic system (Ref. TASK 29-23-00-864-001).
 F 『 EEFF : ALL E Page 20978-30-00
 E E May 01/03 ERE ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (b) Make sure that the hydraulic reservoirs are pressurized at 50 psi

 (3.45 bar) (Ref. TASK 29-14-00-614-002).

 (c) Put a container below the HCU bleed valve to catch the hydraulic fluid.

 (d) Remove the cap from the HCU bleed valve and attach one end of the Skydrol resistant transparent tube to the valve.

 (e) Put the other end of the transparent tube in the container.

 (f) Slowly open the bleed valve and allow hydraulic fluid to drain.

 (g) Continue bleeding as long as the quantity of air bubbles can be seen to be decreasing, and also until a steady flow is achieved. After a reasonable time, when the observable quantity of air bubbles is not changing, close the HCU bleed valve.


 NOTE : Use a second wrench to hold the HCU bleed valve when you
____
 turn the nut to close the valve.

 (h) Operate the thrust reverser for 10 deploy-to-stow cycles (Ref. TASK 78-31-00-710-042). Make sure that the thrust reverser doors operate smoothly.

 (i) If the doors shake during opening or closing, repeat the HCU bleeding procedure as follows :


 NOTE : Do not repeat the HCU bleeding procedure more than tow
____
 times, refer to thrust reverser trouble shooting
 procedure.

 - depressurize the hydraulic system (Ref. TASK 29-23-00-864-001)

 - repeat steps (f) through (h).
 If reverser operates smoothly, proceed from step (j).

 

 (j) Depressurize the hydraulic system (Ref. TASK 29-23-00-864-001).

 (k) Remove the transparent tube and install the cap on the bleed valve.

 (l) Remove the container from below the HCU bleed valve.

 (m) Make sure that the level of the hydraulic fluid in the reservoir is correct. If necessary, fill the reservoir (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).


 F 『 EEFF : ALL E Page 21078-30-00
 E E May 01/03 E E ECES E 5. Close-up

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


________ Subtask 78-30-00-410-052
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 (2) Close the fan cowl doors: (Ref. TASK 71-13-00-410-040)
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR


 (3) Remove the access platform(s).

 (4) Remove the warning notice(s).


 F 『 EEFF : ALL E Page 21178-30-00
 E E May 01/03 E E ECES E THRUST REVERSER - SERVICING

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


___________________________
 TASK 78-30-00-680-001
 Drain the Pipes of the Actuator System
 1. Reason for the Job
__________________
 The thrust reverser consists of a left and right half door. Each half includes an upper and a lower blocker door actuator and a latch mechanism. The actuators and latch mechanism are hydraulically operated. When you drain the lower actuator and latch mechanism you also drain the upper.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific container 1 USgal (4 l)
 No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Referenced Information
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EXHAUST 1(25)