• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 17:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  through the SEC and the static relay. 
R  According to the new throttle control lever position, the ECU commands 
R  the stow sequence as follows: 
R  - The ECU sets the thrust power to idle during transit. 
R  - The ECU closes the HCU directional valve and opens the HCU pressurizing 
R  valve to provide pressure only to the retract side of the blocker doors 
R  actuators. 
R  - The actuators stow the blocker doors. 
R  - The secondary and primary locks are engaged and locked. 
R  - The stow switches send to the ECU a stowing information signal. 
R  - The ECU closes the HCU pressurizing valve. The pressure is removed from 
R  the system. 
R

 E E Aug 01/04 E E ECES E

 F  『
 E  C F M  E
 E  E


 E 56-5B E
 E E
 THRUST REVERSER - MAINTENANCE PRACTICES


_______________________________________ TASK 78-30-00-481-041 Make the Thrust Reverser Unserviceable for Maintenance
 1. Reason for the Job

__________________
 Self Explanatory


 2. Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice No specific access platform 1 m (3 ft. 3 in.) HIX3008 1 LOCK-OUT PIN
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

71-13-00-010-040 Opening of the Fan Cowl Doors 78-30-00-991-304 Fig. 201
 3. Job Set-up
__________ Subtask 78-30-00-941-056
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.


 F 『 EEFF : ALL E Page 20178-30-00
 E E Feb 01/98 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (3) On the overhead maintenance panel 50VU:

 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).


 Subtask 78-30-00-010-055
 B. Get Access
 (1) Open the fan cowl doors: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR

 (2) Put the access platform in position.


 4. Procedure
_________
 (Ref. Fig. 201/TASK 78-30-00-991-304)
 Subtask 78-30-00-040-053
R A. Make the Thrust Reverser Unserviceable for Maintenance R
R (1) Move the HCU lever forward to make the thrust reverser unserviceable R (see sheet .1).
R (2) Install the LOCK-OUT PIN (HIX3008) to hold the lever in the OFF R position (see sheet.2).
R NOTE : The quick-release pin is NOT used in this procedure.
____
 F 『 EEFF : ALL E Page 20278-30-00
 E E May 01/03 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 INTENTIONALLY BLANK

 F 『R E E Page 20378-30-00
 E E May 01/03 E E ECES E F 『 E C F M E E E E 56-5B E

 

R Lock-out pin (HIX 3008) Installation/Removal (for maintenance) R Figure 201/TASK 78-30-00-991-304- 12 (SHEET 1)
 F 『 EEFF : ALL E Page 20478-30-00
 E E May 01/03 E E ECES E F 『 E C F M E E E E 56-5B E

 

R Lock-out pin (HIX 3008) Installation/Removal (for maintenance) R Figure 201/TASK 78-30-00-991-304- 22 (SHEET 2)
 F 『 EEFF : ALL E Page 20578-30-00
 E E May 01/03 E E ECES E

 F  『
 E  C F M  E
 E  E


 E 56-5B E E E TASK 78-30-00-081-041

 Make the Thrust Reverser Serviceable after Maintenance
 1. Reason for the Job

__________________
 Self Explanatory


 2. Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EXHAUST 1(23)